DeWitt County drilling permits
The Texas Railroad Commission issued 300 drilling permits in DeWitt County from June 2025 through Nov 25, 2026. 264 are for new holes (2 vertical, 0 directional and 262 horizontal) and 36 are for work on existing wells, such as recompletions and re-entries. The deepest is ENSIGN NATURAL RESOURCES II LLC MUSSELMAN-MUDD A 1H, permitted to 24,000 feet.
If you own minerals here and want to know what is happening near your land, you’re in the right place. The permits below list the survey, abstract, block and section where each well is to be drilled, which is how mineral owners usually describe a tract, so you can filter the table for yours. Not sure of your abstract number? Our guide on how to find drilling activity near your tract walks through it.
Deepest permits in DeWitt County
Total depth is the depth the operator applied for, so it shows how deep the operator plans to drill, not where the well will produce. The fields listed on a permit are the RRC fields the operator named for the well. A field name often includes a formation, as in Wescott (Strawn), but the list can include several fields and it doesn’t by itself confirm which zone the operator is targeting.
| Issued | Operator | Lease and well | Total depth (ft) | Type | Survey, abstract, block, section | Fields listed on the permit |
|---|---|---|---|---|---|---|
| 2026-11-16 | ENSIGN NATURAL RESOURCES II LLC | MUSSELMAN-MUDD A 1H | 24,000 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-21 | ENSIGN NATURAL RESOURCES II LLC | STEEN-MUSSELMAN F 6H | 23,500 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-21 | ENSIGN NATURAL RESOURCES II LLC | STEEN-STEEN E 5H | 23,500 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: FULCHER, G, A-21 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-26 | ENSIGN NATURAL RESOURCES II LLC | STEEN-MUSSELMAN G 7H | 23,500 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-26 | ENSIGN NATURAL RESOURCES II LLC | STEEN-MUSSELMAN H 8H | 23,000 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-25 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 1 | 17,535 | Recompletion | POWEL, J, A-658 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-24 | BURLINGTON RESOURCES O & G CO LP | BURGE UNIT A USW 1 | 17,500 | Recompletion | I RR CO, A-276, Sec 23Bottom hole: I RR CO, A-275, Sec 21 | DE WITT (EAGLE FORD SHALE) |
| 2025-06-30 | MARATHON OIL EF LLC | EDWARD ROEDER-MIGURA A SA1 1H | 17,500 | Drill (horizontal) | HILL, W G, A-223Bottom hole: WHARTON, J, A-475 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-08 | MARATHON OIL EF LLC | EDWARD ROEDER-JAMES GANO SA1 1H | 17,500 | Drill (horizontal) | HILL, W G, A-223Bottom hole: HOLLIEN, J F, A-235 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW M 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW L 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW K 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW J 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW I 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-08-06 | BURLINGTON RESOURCES O & G CO LP | MOORE-TURBO-WEST USW D 1 | 17,500 | Drill (horizontal) | HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23 | EAGLEVILLE (EAGLE FORD-2) |
All DeWitt County permits since June 2025
| Issued | Operator | Lease and well | Total depth (ft) | Type | Survey, abstract, block, section | Fields listed on the permit |
|---|---|---|---|---|---|---|
| 2026-11-20 | BURLINGTON RESOURCES O & G CO LP | FRANZ-PENTA SA A 1 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11Bottom hole: HALL, J, A-217 | DE WITT (EAGLE FORD SHALE) |
| 2026-11-16 | ENSIGN NATURAL RESOURCES II LLC | MUSSELMAN-MUDD A 1H | 24,000 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-11-06 | BURLINGTON RESOURCES O & G CO LP | FRANZ-MATACOWORCA SA J 1 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9 | DE WITT (EAGLE FORD SHALE) |
| 2026-11-06 | BURLINGTON RESOURCES O & G CO LP | FRANZ-MATACOWORCA SA I 1 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9 | DE WITT (EAGLE FORD SHALE) |
| 2026-11-06 | BURLINGTON RESOURCES O & G CO LP | FRANZ-MATACOWORCA SA H 1 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9 | DE WITT (EAGLE FORD SHALE) |
| 2026-11-03 | BURLINGTON RESOURCES O & G CO LP | FRANZ-MATACOWORCA SA G 2 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9 | DE WITT (EAGLE FORD SHALE) |
| 2026-11-03 | BURLINGTON RESOURCES O & G CO LP | FRANZ-MATACOWORCA SA G 1 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9 | DE WITT (EAGLE FORD SHALE) |
| 2026-11-03 | BURLINGTON RESOURCES O & G CO LP | N STEINMANN UNIT A 3 | 17,500 | Drill (horizontal) | COOK, H P, A-120Bottom hole: COX, S, A-131 | DE WITT (EAGLE FORD SHALE) |
| 2026-10-22 | BURLINGTON RESOURCES O & G CO LP | N STEINMANN UNIT A 6 | 17,500 | Drill (horizontal) | COOK, H P, A-120Bottom hole: COX, S, A-131 | DE WITT (EAGLE FORD SHALE) |
| 2026-10-21 | BURLINGTON RESOURCES O & G CO LP | N STEINMANN UNIT A 5 | 17,500 | Drill (horizontal) | COOK, H P, A-120 | DE WITT (EAGLE FORD SHALE) |
| 2026-10-21 | BURLINGTON RESOURCES O & G CO LP | N STEINMANN UNIT A 4 | 17,500 | Drill (horizontal) | COOK, H P, A-120Bottom hole: COX, S, A-131 | DE WITT (EAGLE FORD SHALE) |
| 2026-10-21 | BURLINGTON RESOURCES O & G CO LP | N STEINMANN UNIT A 7 | 17,500 | Drill (horizontal) | COOK, H P, A-120Bottom hole: COX, S, A-131 | DE WITT (EAGLE FORD SHALE) |
| 2026-10-15 | ENSIGN NATURAL RESOURCES II LLC | HENDERSON 12H | 13,300 | Drill (horizontal) | STUMP, J S, A-430 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-10-15 | ENSIGN NATURAL RESOURCES II LLC | HENDERSON 11H | 13,300 | Drill (horizontal) | STUMP, J S, A-430 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-10-13 | CRESCENT ENERGY OPERATING, LLC | TURKEY BOTTOM-MCKEE 1H | 14,000 | Drill (horizontal) | KIZER, B P, A-286Bottom hole: HUGHES, J, A-29 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-10-09 | BURLINGTON RESOURCES O & G CO LP | FRANZ UNIT A 5 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11 | DE WITT (EAGLE FORD SHALE) |
| 2026-10-07 | BURLINGTON RESOURCES O & G CO LP | FRANZ UNIT A 6 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11 | DE WITT (EAGLE FORD SHALE) |
| 2026-10-06 | BURLINGTON RESOURCES O & G CO LP | FRANZ UNIT A 8 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11 | DE WITT (EAGLE FORD SHALE) |
| 2026-10-06 | BURLINGTON RESOURCES O & G CO LP | FRANZ UNIT A 7 | 17,500 | Drill (horizontal) | I RR CO, A-270, Sec 11Bottom hole: I. RR. CO., A-270 | DE WITT (EAGLE FORD SHALE) |
| 2026-10-01 | RUSK ENERGY OPERATING LLC | KAHLICH GAS UNIT 1 | 11,000 | Drill (vertical) | CALLIHAN, J T, A-110 | WILDCAT |
| 2026-10-01 | CRESCENT ENERGY OPERATING, LLC | CHUMCHAL-LOOS 8H | 14,000 | Drill (horizontal) | KIZER, B P, A-286Bottom hole: SA&MG RR CO, A-447 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-09-30 | CRESCENT ENERGY OPERATING, LLC | TURKEY BOTTOM-ADAMEK A 2H | 14,000 | Drill (horizontal) | KIZER, B P, A-286 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-09-30 | CRESCENT ENERGY OPERATING, LLC | TURKEY BOTTOM-ADAMEK A 201H | 14,000 | Drill (horizontal) | KIZER, B P, A-286 | SUGARKANE (AUSTIN CHALK) |
| 2026-09-30 | CRESCENT ENERGY OPERATING, LLC | CHUMCHAL UNIT 202H | 14,000 | Drill (horizontal) | KIZER, B P, A-286Bottom hole: SA&MG RR CO, A-447 | SUGARKANE (AUSTIN CHALK) |
| 2026-09-25 | BURLINGTON RESOURCES O & G CO LP | N STEINMANN UNIT A 2 | 17,500 | Drill (horizontal) | COOK, H P, A-120Bottom hole: COX, S, A-131 | DE WITT (EAGLE FORD SHALE) |
| 2026-09-16 | BPX OPERATING COMPANY | W. BUTLER A-LP BUTLER B SA 4 4H | 13,500 | Drill (horizontal) | BARRIER, A B, A-642Bottom hole: WRIGHT, R, A-478 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-09-16 | BPX OPERATING COMPANY | W. BUTLER A-E. BUTLER A SA 7 7H | 13,500 | Drill (horizontal) | BARRIER, A B, A-642Bottom hole: WRIGHT, R, A-478 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-09-16 | BPX OPERATING COMPANY | W. BUTLER A-E. BUTLER A SA 6 6H | 13,500 | Drill (horizontal) | BARRIER, A B, A-642Bottom hole: WRIGHT, R, A-478 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-09-16 | BPX OPERATING COMPANY | W. BUTLER A-E. BUTLER A SA 5 5H | 13,500 | Drill (horizontal) | BARRIER, A B, A-642Bottom hole: WRIGHT, R, A-478 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-31 | BPX OPERATING COMPANY | W. BUTLER A 13H | 13,500 | Drill (horizontal) | BARRIER, A B, A-642Bottom hole: LYTTE, W L, A-303 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-26 | ENSIGN NATURAL RESOURCES II LLC | STEEN-MUSSELMAN H 8H | 23,000 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-26 | ENSIGN NATURAL RESOURCES II LLC | STEEN-MUSSELMAN G 7H | 23,500 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-25 | BPX OPERATING COMPANY | W. BUTLER A 16H | 13,500 | Drill (horizontal) | BARRIER, A B, A-642Bottom hole: LYTTE, W L, A-303 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-25 | BPX OPERATING COMPANY | W. BUTLER A 14H | 13,500 | Drill (horizontal) | BARRIER, A B, A-642Bottom hole: LYTTE, W L, A-303 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-25 | BPX OPERATING COMPANY | W. BUTLER A 15H | 13,500 | Drill (horizontal) | BARRIER, A B, A-642Bottom hole: LYTTE, W L, A-303 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-21 | ENSIGN NATURAL RESOURCES II LLC | STEEN-MUSSELMAN F 6H | 23,500 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-08-21 | ENSIGN NATURAL RESOURCES II LLC | STEEN-STEEN E 5H | 23,500 | Drill (horizontal) | DAVIS, D, A-12Bottom hole: FULCHER, G, A-21 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-29 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 29 | 17,500 | Drill (horizontal) | POWEL, J, A-658 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-24 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 46 | 17,500 | Drill (horizontal) | POWEL, J, A-658Bottom hole: BULLOCK, W C, A-31 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-24 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 45 | 17,500 | Drill (horizontal) | POWEL, J, A-658Bottom hole: BULLOCK, W C, A-31 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-23 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 43 | 17,500 | Drill (horizontal) | POWEL, J, A-658Bottom hole: BULLOCK, W C, A-31 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-23 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 41 | 17,500 | Drill (horizontal) | POWEL, J, A-658Bottom hole: BULLOCK, W C, A-31 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-23 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 28 | 17,500 | Drill (horizontal) | POWEL, J, A-658 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-23 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 27 | 17,500 | Drill (horizontal) | POWEL, J, A-658 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-10 | DEVON ENERGY PRODUCTION CO, L.P. | HEIBEL A 16H | 14,000 | Drill (horizontal) | B. FULCHER, A-190Bottom hole: FULCHER, G, A-21 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-10 | DEVON ENERGY PRODUCTION CO, L.P. | HEIBEL A 15H | 14,000 | Drill (horizontal) | B. FULCHER, A-190Bottom hole: FULCHER, G, A-21 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-10 | DEVON ENERGY PRODUCTION CO, L.P. | HEIBEL A 14H | 14,000 | Drill (horizontal) | B. FULCHER, A-190 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-10 | DEVON ENERGY PRODUCTION CO, L.P. | HEIBEL A 13H | 14,000 | Drill (horizontal) | B. FULCHER, A-190Bottom hole: FULCHER, G, A-21 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-10 | DEVON ENERGY PRODUCTION CO, L.P. | HEIBEL A 12H | 14,000 | Drill (horizontal) | B. FULCHER, A-190Bottom hole: FULCHER, G, A-21 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-10 | DEVON ENERGY PRODUCTION CO, L.P. | HEIBEL A 11H | 14,000 | Drill (horizontal) | B. FULCHER, A-190Bottom hole: FULCHER, G, A-21 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-10 | DEVON ENERGY PRODUCTION CO, L.P. | HEIBEL A 10H | 14,000 | Drill (horizontal) | B. FULCHER, A-190Bottom hole: FULCHER, G, A-21 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-07-01 | MARATHON OIL EF LLC | SCHORLEMER QUAD SA A 1 | 17,500 | Drill (horizontal) | HURST, S D, A-222Bottom hole: KING, J A, A-288 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-30 | MARATHON OIL EF LLC | HOPE-DWOR-SAUN B SA A 1 | 17,500 | Drill (horizontal) | CARSON, S B, A-113Bottom hole: I RR CO/BUSCHICK, H, A-577, Sec 42 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-29 | MARATHON OIL EF LLC | HOPE-SAUNDERS B SA E 1 | 17,500 | Drill (horizontal) | CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-29 | MARATHON OIL EF LLC | HOPE-SAUNDERS B SA D 1 | 17,500 | Drill (horizontal) | CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-29 | MARATHON OIL EF LLC | HOPE-SAUNDERS B SA C 1 | 17,500 | Drill (horizontal) | CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-29 | MARATHON OIL EF LLC | HOPE-SAUNDERS B SA B 1 | 17,500 | Drill (horizontal) | CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-29 | MARATHON OIL EF LLC | HOPE-SAUNDERS B SA A 1 | 17,500 | Drill (horizontal) | CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-26 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR E-MUIR D SA A 1H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-25 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR C 6H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-25 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR C 5H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-25 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR B 8H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-25 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR B 7H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-25 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR B 5H | 14,000 | Drill (horizontal) | FULCHER, C, A-20 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-25 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR B 4H | 14,000 | Drill (horizontal) | FULCHER, C, A-20 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-19 | BURLINGTON RESOURCES O & G CO LP | C W HAHN-RICE 1 SA G 1 | 17,500 | Drill (horizontal) | I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-268, Sec 61 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-19 | BURLINGTON RESOURCES O & G CO LP | C W HAHN-RICE 1 SA F 1 | 17,500 | Drill (horizontal) | I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO/LACKEY, S C, A-693, Sec 62 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-19 | BURLINGTON RESOURCES O & G CO LP | C W HAHN-RICE 1 SA E 1 | 17,500 | Drill (horizontal) | I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO/LACKEY, S C, A-693, Sec 62 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-19 | BURLINGTON RESOURCES O & G CO LP | C W HAHN-MEI-RIC SA D 1 | 17,500 | Drill (horizontal) | I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-260, Sec 45 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-19 | BURLINGTON RESOURCES O & G CO LP | R MEISCHEN-RICE SA C 1 | 17,500 | Drill (horizontal) | I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-260, Sec 45 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-19 | BURLINGTON RESOURCES O & G CO LP | R MEISCHEN-RICE SA B 1 | 17,500 | Drill (horizontal) | I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-260, Sec 45 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-19 | BURLINGTON RESOURCES O & G CO LP | R MEISCHEN-RICE SA A 1 | 17,500 | Drill (horizontal) | I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-260, Sec 45 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-15 | BURLINGTON RESOURCES O & G CO LP | SAUNDERS UNIT B 14 | 17,500 | Drill (horizontal) | I RR CO, A-257, Sec 39 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-15 | BURLINGTON RESOURCES O & G CO LP | SAUNDERS UNIT B 13 | 17,500 | Drill (horizontal) | I RR CO, A-257, Sec 39 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-15 | MARATHON OIL EF LLC | SCHORLEMER-CHAR SA A 1 | 17,500 | Drill (horizontal) | HURST, S D, A-222Bottom hole: KING, J A, A-288 | DE WITT (EAGLE FORD SHALE) |
| 2026-06-12 | BPX OPERATING COMPANY | WARREN B-WARREN A SA 1 1H | 14,000 | Drill (horizontal) | PARMER, R, A-382Bottom hole: COOK, H P, A-120 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-06-10 | HURD ENTERPRISES, LTD. | BEARD ETAL GU 1 | 11,500 | Drill (vertical) | DOWLAN, P, A-152 | WILDCAT; MISSION VALLEY, W. (WILCOX G); MISSION VALLEY, W.(WILCOX 10600) |
| 2026-05-27 | DEVON ENERGY PRODUCTION CO, L.P. | GUEVARA B - CREEK SA B 2H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: MILLS, R, A-39 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-05-27 | DEVON ENERGY PRODUCTION CO, L.P. | GUEVARA B - CREEK SA A 1H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: MILLS, R, A-39 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-05-27 | DEVON ENERGY PRODUCTION CO, L.P. | ULRICH A-PEEB A-GUEV B-CRK SA A 1H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: MILLS, R, A-39 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-05-27 | DEVON ENERGY PRODUCTION CO, L.P. | PEEBLES A - CREEK SA A 1H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: MILLS, R, A-39 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-05-19 | BPX OPERATING COMPANY | WARREN B-WARREN A SA 4 4H | 14,000 | Drill (horizontal) | PARMER, R, A-382Bottom hole: COOK, H P, A-120 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-05-19 | BPX OPERATING COMPANY | WARREN B-WARREN A SA 3 3H | 14,000 | Drill (horizontal) | PARMER, R, A-382Bottom hole: COOK, H P, A-120 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-05-19 | BPX OPERATING COMPANY | WARREN B-WARREN A SA 2 2H | 14,000 | Drill (horizontal) | PARMER, R, A-382Bottom hole: COOK, H P, A-120 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-05-06 | BPX OPERATING COMPANY | WARREN B 9H | 14,000 | Drill (horizontal) | PARMER, R, A-382Bottom hole: COOK, H P, A-120 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-05-05 | DEVON ENERGY PRODUCTION CO, L.P. | PEEBLES A 10H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: FULCHER, C, A-20 | DE WITT (EAGLE FORD SHALE) |
| 2026-04-24 | DEVON ENERGY PRODUCTION CO, L.P. | RUPPERT A 23H | 14,000 | Drill (horizontal) | BELL, T C, A-65Bottom hole: TAYLOR, C, A-279 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-23 | DEVON ENERGY PRODUCTION CO, L.P. | RUPPERT A-G KLEIN-JOHNSON A SA A 1H | 14,000 | Drill (horizontal) | BELL, T C, A-65Bottom hole: TAYLOR, C, A-279 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-23 | DEVON ENERGY PRODUCTION CO, L.P. | RUPPERT A-JOHNSON A SA A 1H | 14,000 | Drill (horizontal) | BELL, T C, A-65Bottom hole: TAYLOR, C, A-279 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-02 | BURLINGTON RESOURCES O & G CO LP | LL A JANSKY A USW L 1 | 17,500 | Drill (horizontal) | I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-01 | DEVON ENERGY PRODUCTION CO, L.P. | CANTU B-HYATT A SA A 1H | 14,000 | Drill (horizontal) | TRAVIS DAVIS, A-162 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-01 | DEVON ENERGY PRODUCTION CO, L.P. | CANTU B 22H | 14,000 | Drill (horizontal) | DAVIS, T, A-162 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-01 | DEVON ENERGY PRODUCTION CO, L.P. | CANTU B 20H | 14,000 | Drill (horizontal) | DAVIS, T, A-162 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-01 | DEVON ENERGY PRODUCTION CO, L.P. | CANTU B 19H | 14,000 | Drill (horizontal) | DAVIS, T, A-162 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-01 | DEVON ENERGY PRODUCTION CO, L.P. | CANTU B 17H | 14,000 | Drill (horizontal) | DAVIS, T, A-162 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-01 | DEVON ENERGY PRODUCTION CO, L.P. | CANTU B 16H | 14,000 | Drill (horizontal) | DAVIS, T, A-162 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-01 | DEVON ENERGY PRODUCTION CO, L.P. | CANTU B 15H | 14,000 | Drill (horizontal) | DAVIS, T, A-162 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-01 | DEVON ENERGY PRODUCTION CO, L.P. | CANTU B 14H | 14,000 | Drill (horizontal) | DAVIS, T, A-162 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-04-01 | DEVON ENERGY PRODUCTION CO, L.P. | CANTU B 13H | 14,000 | Drill (horizontal) | DAVIS, T, A-162 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-03-31 | BURLINGTON RESOURCES O & G CO LP | LL-QUAD ULW A 1 | 17,500 | Drill (horizontal) | I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-03-30 | BURLINGTON RESOURCES O & G CO LP | LL A JANSKY A USW K 1 | 17,500 | Drill (horizontal) | I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-03-30 | BURLINGTON RESOURCES O & G CO LP | LL A JANSKY A USW J 1 | 17,500 | Drill (horizontal) | I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-03-30 | BURLINGTON RESOURCES O & G CO LP | LL A JANSKY A USW H 1 | 17,500 | Drill (horizontal) | I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-03-30 | BURLINGTON RESOURCES O & G CO LP | LL A JANSKY A USW G 1 | 17,500 | Drill (horizontal) | I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-03-30 | BURLINGTON RESOURCES O & G CO LP | CULPEPPER-BURGE USW E 1 | 17,500 | Drill (horizontal) | I RR CO, A-267, Sec 57Bottom hole: FASSETT, F, A-707, Sec 22 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-03-26 | BURLINGTON RESOURCES O & G CO LP | CULPEPPER-BURGE USW D 1 | 17,500 | Drill (horizontal) | I RR CO, A-267, Sec 57Bottom hole: FASSETT, F, A-707, Sec 22 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-03-26 | BURLINGTON RESOURCES O & G CO LP | SAUNDERS UNIT A 12 | 17,500 | Drill (horizontal) | I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83 | DE WITT (EAGLE FORD SHALE) |
| 2026-03-26 | BURLINGTON RESOURCES O & G CO LP | SAUNDERS UNIT A 13 | 17,500 | Drill (horizontal) | I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83 | DE WITT (EAGLE FORD SHALE) |
| 2026-03-26 | BURLINGTON RESOURCES O & G CO LP | SAUNDERS UNIT A 10 | 17,500 | Drill (horizontal) | I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83 | DE WITT (EAGLE FORD SHALE) |
| 2026-03-26 | BURLINGTON RESOURCES O & G CO LP | SAUNDERS UNIT A 11 | 17,500 | Drill (horizontal) | I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83 | DE WITT (EAGLE FORD SHALE) |
| 2026-03-26 | BURLINGTON RESOURCES O & G CO LP | SAUNDERS UNIT A 9 | 17,500 | Drill (horizontal) | I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83 | DE WITT (EAGLE FORD SHALE) |
| 2026-02-12 | BPX OPERATING COMPANY | CANTU A BPX 8H | 12,810 | Recompletion | MEISSNER, J, A-345 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-12 | BPX OPERATING COMPANY | CANTU A BPX 5H | 13,047 | Recompletion | MEISSNER, J, A-345Bottom hole: PARMER, R, A-382 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-12 | BPX OPERATING COMPANY | CANTU A BPX 3H | 13,046 | Recompletion | MEISSNER, J, A-345Bottom hole: PARMER, R, A-382 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-10 | BURLINGTON RESOURCES O & G CO LP | SCHMIDT-MUSCH-JOHN USW C 1 | 17,500 | Drill (horizontal) | I RR CO, A-268, Sec 61Bottom hole: I&GN RR CO, A-462 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-10 | BURLINGTON RESOURCES O & G CO LP | SCHMIDT-MUSCH-JOHN USW B 1 | 17,500 | Drill (horizontal) | I RR CO, A-268, Sec 61Bottom hole: I&GN RR CO, A-462 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-10 | BURLINGTON RESOURCES O & G CO LP | SCHMIDT-MUSCHALEK USW A 1 | 17,500 | Drill (horizontal) | I RR CO, A-268, Sec 61Bottom hole: I&GN RR CO, A-278 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-10 | BPX OPERATING COMPANY | CANTU A BPX-KICKENDAHL 1 SA 8 8H | 14,000 | Drill (horizontal) | MEISSNER, J, A-345Bottom hole: COX, S, A-131 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-10 | BPX OPERATING COMPANY | CANTU A BPX-KICKENDAHL 1 SA 7 7H | 14,000 | Drill (horizontal) | MEISSNER, J, A-345Bottom hole: COX, S, A-131 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-06 | BURLINGTON RESOURCES O & G CO LP | SCHMIDT UNIT A 4 | 17,500 | Drill (horizontal) | I RR CO, A-268, Sec 61Bottom hole: I RR CO, A-269, Sec 63 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-06 | BURLINGTON RESOURCES O & G CO LP | SCHMIDT UNIT A 3 | 17,500 | Drill (horizontal) | I RR CO, A-268, Sec 61Bottom hole: I RR CO, A-269, Sec 63 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-06 | BURLINGTON RESOURCES O & G CO LP | SCHMIDT UNIT A 2 | 17,500 | Drill (horizontal) | I RR CO, A-268, Sec 61Bottom hole: I RR CO, A-269, Sec 63 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-06 | BPX OPERATING COMPANY | CANTU A BPX 16H | 14,000 | Drill (horizontal) | MEISSNER, J, A-345 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-06 | BPX OPERATING COMPANY | CANTU A BPX 15H | 14,000 | Drill (horizontal) | MEISSNER, J, A-345 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-06 | BPX OPERATING COMPANY | CANTU A BPX 14H | 14,000 | Drill (horizontal) | MEISSNER, J, A-345Bottom hole: COOK, H P, A-120 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-06 | DEVON ENERGY PRODUCTION CO, L.P. | BOYSEN B - S. WITTE A SA A 1H | 14,000 | Drill (horizontal) | SINCLAIR, R, A-429 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-06 | DEVON ENERGY PRODUCTION CO, L.P. | A. WITTE A 5H | 14,000 | Drill (horizontal) | SINCLAIR, R, A-429 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-05 | BURLINGTON RESOURCES O & G CO LP | P CRAIN-STAN SA C 1 | 17,500 | Drill (horizontal) | HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19 | DE WITT (EAGLE FORD SHALE) |
| 2026-02-05 | BURLINGTON RESOURCES O & G CO LP | P CRAIN-STAN SA B 3 | 17,500 | Drill (horizontal) | HALL, J, A-217Bottom hole: HALL, J, A-274 | DE WITT (EAGLE FORD SHALE) |
| 2026-02-05 | BURLINGTON RESOURCES O & G CO LP | P CRAIN-STAN SA B 2 | 17,500 | Drill (horizontal) | HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19 | DE WITT (EAGLE FORD SHALE) |
| 2026-02-05 | BURLINGTON RESOURCES O & G CO LP | P CRAIN-STAN SA B 1 | 17,500 | Drill (horizontal) | HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19 | DE WITT (EAGLE FORD SHALE) |
| 2026-02-05 | BURLINGTON RESOURCES O & G CO LP | P CRAIN-STAN SA A 3 | 17,500 | Drill (horizontal) | HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19 | DE WITT (EAGLE FORD SHALE) |
| 2026-02-05 | BURLINGTON RESOURCES O & G CO LP | P CRAIN-STAN SA A 2 | 17,500 | Drill (horizontal) | HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19 | DE WITT (EAGLE FORD SHALE) |
| 2026-02-05 | BURLINGTON RESOURCES O & G CO LP | P CRAIN-STAN SA A 1 | 17,500 | Drill (horizontal) | HALL, J, A-217Bottom hole: HALL, J, A-274 | DE WITT (EAGLE FORD SHALE) |
| 2026-02-05 | BPX OPERATING COMPANY | CANTU A BPX-HARTMAN A SA 9 9H | 14,000 | Drill (horizontal) | MEISSNER, J, A-345Bottom hole: COX, S, A-131 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-05 | BPX OPERATING COMPANY | CANTU A BPX-HARTMAN A SA 6 6H | 14,000 | Drill (horizontal) | MEISSNER, J, A-345Bottom hole: COOK, H P, A-120 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-05 | BPX OPERATING COMPANY | CANTU A BPX-HARTMAN A SA 5 5H | 14,000 | Drill (horizontal) | MEISSNER, J, A-345Bottom hole: COX, S, A-131 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-05 | BPX OPERATING COMPANY | CANTU A BPX-HARTMAN A SA 4 4H | 14,000 | Drill (horizontal) | MEISSNER, J, A-345Bottom hole: COX, S, A-131 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-05 | DEVON ENERGY PRODUCTION CO, L.P. | BOYSEN B - S. WITTE A SA E 5H | 14,000 | Drill (horizontal) | SINCLAIR, R, A-429 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-05 | DEVON ENERGY PRODUCTION CO, L.P. | BOYSEN B - S. WITTE A SA D 4H | 14,000 | Drill (horizontal) | SINCLAIR, R, A-429 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-05 | DEVON ENERGY PRODUCTION CO, L.P. | BOYSEN B - S. WITTE A SA C 3H | 14,000 | Drill (horizontal) | SINCLAIR, R, A-429 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-02-05 | DEVON ENERGY PRODUCTION CO, L.P. | BOYSEN B - S. WITTE A SA B 2H | 14,000 | Drill (horizontal) | SINCLAIR, R, A-429 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-27 | BURLINGTON RESOURCES O & G CO LP | HAHN-D CIL-MAUR-SEI ULW I 1 | 17,500 | Drill (horizontal) | ROBERSON, W, A-401Bottom hole: BENTON, D, A-67 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-27 | BURLINGTON RESOURCES O & G CO LP | HAHN-D CIL-SEI USW G 1 | 17,500 | Drill (horizontal) | ROBERSON, W, A-401Bottom hole: DONOHO, J, A-142 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-27 | BURLINGTON RESOURCES O & G CO LP | HAHN-D CIL-SEI USW E 1 | 17,500 | Drill (horizontal) | ROBERSON, W, A-401Bottom hole: DONOHO, J, A-142 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-27 | BURLINGTON RESOURCES O & G CO LP | HAHN-D CIL USW H 1 | 17,500 | Drill (horizontal) | ROBERSON, W, A-401Bottom hole: BENTON, D, A-67 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-23 | BURLINGTON RESOURCES O & G CO LP | HAHN-D CIL-SEI USW F 1 | 17,500 | Drill (horizontal) | ROBERSON, W, A-401Bottom hole: DONOHO, J, A-142 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-22 | DEVON ENERGY PRODUCTION CO, L.P. | WILLIAMS A-ULRICH A-GUEV AB SA A 1H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-22 | DEVON ENERGY PRODUCTION CO, L.P. | WILLIAMS A-STEIN A-SHEPPA A SA A 1H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-22 | DEVON ENERGY PRODUCTION CO, L.P. | WILLIAMS A-STEIN-GUEVA A SA A 1H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-21 | REPSOL OIL & GAS USA, LLC | THIEME-SMITH-SEILER (SA) A5 A 5H | 14,000 | Drill (horizontal) | I RR CO, A-250, Sec 25Bottom hole: HILL, W G, A-223 | SUGARKANE (EAGLE FORD) |
| 2026-01-21 | REPSOL OIL & GAS USA, LLC | THIEME-SMITH-BILM-SEILER (SA) A4 A 4H | 14,000 | Drill (horizontal) | I RR CO, A-250, Sec 25Bottom hole: HILL, W G, A-223 | SUGARKANE (EAGLE FORD) |
| 2026-01-21 | REPSOL OIL & GAS USA, LLC | THIEME-SMITH-BILMARK (SA) A3 A 3H | 14,000 | Drill (horizontal) | I RR CO, A-250, Sec 25Bottom hole: HILL, W G, A-223 | SUGARKANE (EAGLE FORD) |
| 2026-01-21 | REPSOL OIL & GAS USA, LLC | THIEME-SMITH-BILMARK (SA) A2 A 2H | 14,000 | Drill (horizontal) | I RR CO, A-250, Sec 25Bottom hole: HILL, W G, A-223 | SUGARKANE (EAGLE FORD) |
| 2026-01-15 | BPX OPERATING COMPANY | SEIFERT B-SEIFERT C SA 2 2H | 14,000 | Drill (horizontal) | HACKNEY, F N, A-650Bottom hole: MC LANE, N, A-654 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-14 | DEVON ENERGY PRODUCTION CO, L.P. | WILLIAMS A - GUEVARA A SA C 3H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-14 | DEVON ENERGY PRODUCTION CO, L.P. | STEINMANN A - SHEPPARD A SA F 6H | 14,000 | Drill (horizontal) | J. MCCOY, JR., A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-14 | DEVON ENERGY PRODUCTION CO, L.P. | STEINMANN A - SHEPPARD A SA D 4H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-14 | DEVON ENERGY PRODUCTION CO, L.P. | STEINMANN A - SHEPPARD A SA C 3H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-14 | DEVON ENERGY PRODUCTION CO, L.P. | STEINMANN A - SHEPPARD A SA B 2H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-14 | DEVON ENERGY PRODUCTION CO, L.P. | STEINMANN A - SHEPPARD A SA A 1H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-13 | DEVON ENERGY PRODUCTION CO, L.P. | WILLIAMS A - GUEVARA A SA B 2H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-13 | DEVON ENERGY PRODUCTION CO, L.P. | WILLIAMS A - GUEVARA A SA A 1H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-13 | DEVON ENERGY PRODUCTION CO, L.P. | WILLIAMS A 6H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-13 | DEVON ENERGY PRODUCTION CO, L.P. | WILLIAMS A 5H | 14,000 | Drill (horizontal) | J. MCCOY, JR., A-30 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-12 | DEVON ENERGY PRODUCTION CO, L.P. | STEINMANN A - SHEPPARD A SA E 5H | 14,000 | Drill (horizontal) | MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-12 | BURLINGTON RESOURCES O & G CO LP | FRISBIE HEXA USW A 1 | 17,500 | Drill (horizontal) | HUNTER, W W, A-224Bottom hole: I RR CO/STAYTON, J W, A-675, Sec 56 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-12 | BURLINGTON RESOURCES O & G CO LP | FRISBIE-LL A 639 B USW A 1 | 17,500 | Drill (horizontal) | HUNTER, W W, A-224Bottom hole: I RR CO / FASSETT, F, A-639, Sec 58 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-09 | BPX OPERATING COMPANY | SEIFERT B 12H | 14,000 | Drill (horizontal) | HACKNEY, F N, A-650Bottom hole: FOSTER, I R, A-648 | EAGLEVILLE (EAGLE FORD-2) |
| 2026-01-09 | BPX OPERATING COMPANY | SEIFERT B 11H | 14,000 | Drill (horizontal) | F.N. HACKNEY, A-650Bottom hole: J. STRICKLAND, A-664 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-12-16 | BURLINGTON RESOURCES O & G CO LP | FRISBIE UNIT A 3 | 17,500 | Drill (horizontal) | HUNTER, W W, A-224Bottom hole: I RR CO, A-267, Sec 57 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-12-04 | BURLINGTON RESOURCES O & G CO LP | GOHLKE UNIT A 2 | 13,724 | Recompletion | LEAL, F, A-304 | DE WITT (EAGLE FORD SHALE) |
| 2025-12-03 | BURLINGTON RESOURCES O & G CO LP | BUTLER UNIT D 2 | 13,517 | Recompletion | LEAL, F, A-304 | DE WITT (EAGLE FORD SHALE) |
| 2025-12-02 | DEVON ENERGY PRODUCTION CO, L.P. | HANSEN A 9H | 14,000 | Drill (horizontal) | HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-11-24 | DEVON ENERGY PRODUCTION CO, L.P. | CARSON A - ELDER B SA A 1H | 14,000 | Drill (horizontal) | WYNN, R H, A-474Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-1) |
| 2025-11-24 | BPX OPERATING COMPANY | H SISTERS B-H SISTERS A SA 6 6H | 14,000 | Drill (horizontal) | I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-11-07 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR D 16H | 14,000 | Drill (horizontal) | J. HARWOOD, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-11-05 | DEVON ENERGY PRODUCTION CO, L.P. | HANSEN A 16H | 14,000 | Drill (horizontal) | HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-11-05 | DEVON ENERGY PRODUCTION CO, L.P. | HANSEN A 15H | 14,000 | Drill (horizontal) | HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-11-05 | DEVON ENERGY PRODUCTION CO, L.P. | HANSEN A 13H | 14,000 | Drill (horizontal) | HARWOOD, J, A-213Bottom hole: T&NO RR CO, A-213, Blk 1T, Sec 191 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-11-05 | DEVON ENERGY PRODUCTION CO, L.P. | HANSEN A 12H | 14,000 | Drill (horizontal) | J. HARWOOD, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-11-05 | DEVON ENERGY PRODUCTION CO, L.P. | HANSEN A 11H | 14,000 | Drill (horizontal) | HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-11-05 | DEVON ENERGY PRODUCTION CO, L.P. | HANSEN A 10H | 14,000 | Drill (horizontal) | J. HARWOOD, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-10-23 | BPX OPERATING COMPANY | NELSON A-CASKEY A SA 7 7H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-10-23 | BURLINGTON RESOURCES O & G CO LP | WARZECHA UNIT A 2 | 12,761 | Recompletion | ROBERSON, W, A-401Bottom hole: COOK, H P, A-120 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-10-22 | BPX OPERATING COMPANY | NELSON A-CASKEY A SA 6 6H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-10-22 | BPX OPERATING COMPANY | NELSON A-CASKEY A SA 5 5H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-10-22 | BPX OPERATING COMPANY | NELSON A-CASKEY A SA 4 4H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-10-22 | BPX OPERATING COMPANY | NELSON A-CASKEY A SA 3 3H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-10-22 | BPX OPERATING COMPANY | NELSON A-CASKEY B SA 2 2H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-10-15 | BURLINGTON RESOURCES O & G CO LP | HAM-HOOKS-WILD USW J 1 | 17,500 | Drill (horizontal) | ROSS, J E, A-405Bottom hole: WAIT, J, A-490 | DE WITT (EAGLE FORD SHALE) |
| 2025-10-15 | BURLINGTON RESOURCES O & G CO LP | HAM-HOOKS-WILD USW I 1 | 17,500 | Drill (horizontal) | ROSS, J E, A-405Bottom hole: WAIT, J, A-490 | DE WITT (EAGLE FORD SHALE) |
| 2025-10-15 | BURLINGTON RESOURCES O & G CO LP | HAM-HOOKS-WILD USW H 1 | 17,500 | Drill (horizontal) | ROSS, J E, A-405Bottom hole: WAIT, J, A-490 | DE WITT (EAGLE FORD SHALE) |
| 2025-10-13 | BURLINGTON RESOURCES O & G CO LP | HAMILTON TRUST UNIT B 2 | 17,500 | Drill (horizontal) | ROSS, J E, A-405 | DE WITT (EAGLE FORD SHALE) |
| 2025-10-07 | BURLINGTON RESOURCES O & G CO LP | ADIX UNIT A 3 | 13,494 | Recompletion | FASSETT, F, A-707, Sec 22Bottom hole: I RR CO / BUCK, J C, A-513, Sec 20 | DE WITT (EAGLE FORD SHALE) |
| 2025-10-06 | BURLINGTON RESOURCES O & G CO LP | STRAUBE UNIT A 6 | 13,335 | Recompletion | FASSETT, F, A-707, Sec 22Bottom hole: HALL, J, A-217 | DE WITT (EAGLE FORD SHALE) |
| 2025-10-06 | BURLINGTON RESOURCES O & G CO LP | STRAUBE UNIT A 7 | 13,400 | Recompletion | FASSETT, F, A-707, Sec 22Bottom hole: HALL, J, A-217 | DE WITT (EAGLE FORD SHALE) |
| 2025-10-06 | BURLINGTON RESOURCES O & G CO LP | STRAUBE UNIT A 4 | 13,407 | Recompletion | FASSETT, F, A-707, Sec 22 | DE WITT (EAGLE FORD SHALE) |
| 2025-10-06 | BURLINGTON RESOURCES O & G CO LP | HAM-HOOKS-WILD ULW A 1 | 17,500 | Drill (horizontal) | ROSS, J E, A-405Bottom hole: PENICK, T M, A-536 | DE WITT (EAGLE FORD SHALE) |
| 2025-09-23 | DEVON ENERGY PRODUCTION CO, L.P. | CARSON A 14H | 14,000 | Drill (horizontal) | WYNN, R H, A-474Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-1) |
| 2025-09-19 | DEVON ENERGY PRODUCTION CO, L.P. | ELDER B 19H | 14,000 | Drill (horizontal) | WYNN, R H, A-474Bottom hole: FULCHER, C, A-20 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-09-18 | DEVON ENERGY PRODUCTION CO, L.P. | CARSON A 17H | 14,000 | Drill (horizontal) | WYNN, R H, A-474Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-1) |
| 2025-09-18 | BURLINGTON RESOURCES O & G CO LP | HAM-HOOKS-WILD USW G 1 | 17,500 | Drill (horizontal) | ROSS, J E, A-405Bottom hole: WAIT, J, A-490 | DE WITT (EAGLE FORD SHALE) |
| 2025-09-18 | BURLINGTON RESOURCES O & G CO LP | HAM-HOOKS-WILD USW F 1 | 17,500 | Drill (horizontal) | ROSS, J E, A-405Bottom hole: MEP&P RR CO, A-359 | DE WITT (EAGLE FORD SHALE) |
| 2025-09-18 | BURLINGTON RESOURCES O & G CO LP | MOTL UNIT A 1 | 13,390 | Recompletion | PHARRASS, S, A-377Bottom hole: FENNELL, J, A-18 | DE WITT (EAGLE FORD SHALE) |
| 2025-09-18 | BURLINGTON RESOURCES O & G CO LP | RICE UNIVERISTY 3 | 13,041 | Recompletion | I RR CO / LACKEY, S C, A-588, Sec 46Bottom hole: I RR CO, A-260, Sec 45 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-09-17 | DEVON ENERGY PRODUCTION CO, L.P. | CARSON A 13H | 14,000 | Drill (horizontal) | WYNN, R H, A-474Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-1) |
| 2025-09-08 | BURLINGTON RESOURCES O & G CO LP | WILD-HOOKS-HAM USW E 1 | 17,500 | Drill (horizontal) | WAIT, J, A-490Bottom hole: CAPLES, E, A-121 | DE WITT (EAGLE FORD SHALE) |
| 2025-09-08 | BURLINGTON RESOURCES O & G CO LP | WILD-HOOKS USW A 1 | 17,500 | Drill (horizontal) | WAIT, J, A-490Bottom hole: MEP&P RR CO, A-359 | DE WITT (EAGLE FORD SHALE) |
| 2025-08-29 | BURLINGTON RESOURCES O & G CO LP | WILD-HOOKS USW D 1 | 17,500 | Drill (horizontal) | WAIT, J, A-490Bottom hole: MEP&P RR CO, A-359 | DE WITT (EAGLE FORD SHALE) |
| 2025-08-29 | BURLINGTON RESOURCES O & G CO LP | WILD-HOOKS USW C 1 | 17,500 | Drill (horizontal) | WAIT, J, A-490Bottom hole: MEP&P RR CO, A-359 | DE WITT (EAGLE FORD SHALE) |
| 2025-08-29 | BURLINGTON RESOURCES O & G CO LP | WILD-HOOKS USW B 1 | 17,500 | Drill (horizontal) | WAIT, J, A-490Bottom hole: MEP&P RR CO, A-359 | DE WITT (EAGLE FORD SHALE) |
| 2025-08-29 | DEVON ENERGY PRODUCTION CO, L.P. | D. BOOTHE A-POHLER A AC 1H | 14,000 | Drill (horizontal) | CLEMENTS, J D, A-10Bottom hole: BEST, HRS R, A-79 | SUGARKANE (AUSTIN CHALK) |
| 2025-08-27 | BPX OPERATING COMPANY | NELSON A-CASKEY B SA 8 8H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-27 | DEVON ENERGY PRODUCTION CO, L.P. | WITTE A-JACOBS A-BOENING AW D 4H | 14,000 | Drill (horizontal) | CLEMENTS, J D, A-10 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-27 | DEVON ENERGY PRODUCTION CO, L.P. | WITTE A-JACOBS A-BOENING AW C 3H | 14,000 | Drill (horizontal) | CLEMENTS, J D, A-10 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-27 | DEVON ENERGY PRODUCTION CO, L.P. | WITTE A-JACOBS A-BOENING AW B 2H | 14,000 | Drill (horizontal) | CLEMENTS, J D, A-10 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-27 | DEVON ENERGY PRODUCTION CO, L.P. | WITTE A-JACOBS A-BOENING AW A 1H | 14,000 | Drill (horizontal) | CLEMENTS, J D, A-10Bottom hole: READ, J, A-538 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-27 | DEVON ENERGY PRODUCTION CO, L.P. | WITTE A 2H | 14,000 | Drill (horizontal) | CLEMENTS, J D, A-10 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-18 | BPX OPERATING COMPANY | LANIK B-LANIK A SA 7 7H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-18 | BPX OPERATING COMPANY | LANIK B-LANIK A SA 6 6H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-18 | BPX OPERATING COMPANY | LANIK B-LANIK A SA 5 5H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-18 | BPX OPERATING COMPANY | LANIK B-LANIK A SA 4 4H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-15 | BPX OPERATING COMPANY | LANIK B-LANIK A SA 3 3H | 14,000 | Drill (horizontal) | NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-13 | BURLINGTON RESOURCES O & G CO LP | WARZECHA UNIT A 1 | 12,711 | Recompletion | ROBERSON, W, A-401Bottom hole: COOK, H P, A-120 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-13 | DEVON ENERGY PRODUCTION CO, L.P. | MARIE A - LANE A SA A 1H | 14,000 | Drill (horizontal) | WAIT, J, A-490Bottom hole: WENTWORTH, T, A-49 | DE WITT (EAGLE FORD SHALE) |
| 2025-08-13 | DEVON ENERGY PRODUCTION CO, L.P. | MARIE A 5H | 14,000 | Drill (horizontal) | WAIT, J, A-490Bottom hole: MOSS, E, A-40 | DE WITT (EAGLE FORD SHALE) |
| 2025-08-13 | DEVON ENERGY PRODUCTION CO, L.P. | MARIE A 4H | 14,000 | Drill (horizontal) | WAIT, J, A-490Bottom hole: MOSS, E, A-40 | DE WITT (EAGLE FORD SHALE) |
| 2025-08-13 | BURLINGTON RESOURCES O & G CO LP | JUSTISS UNIT C 1 | 12,130 | Recompletion | AMADOR, R, A-1 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-06 | BURLINGTON RESOURCES O & G CO LP | MOORE-TURBO-WEST USW D 1 | 17,500 | Drill (horizontal) | HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-06 | BURLINGTON RESOURCES O & G CO LP | MOORE-TURBO-WEST USW C 1 | 17,500 | Drill (horizontal) | HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-06 | BURLINGTON RESOURCES O & G CO LP | MOORE-TURBO-WEST USW B 1 | 17,500 | Drill (horizontal) | HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-06 | BURLINGTON RESOURCES O & G CO LP | MOORE-TURBO-WEST USW A 1 | 17,500 | Drill (horizontal) | HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-08-04 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 8 | 12,903 | Recompletion | POWEL, J, A-658 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW M 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW L 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW K 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW J 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-31 | BURLINGTON RESOURCES O & G CO LP | BUTLER B-HART A USW I 1 | 17,500 | Drill (horizontal) | LEAL, F, A-304Bottom hole: QUINN, W, A-394 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-30 | DEVON ENERGY PRODUCTION CO, L.P. | WILLIAMS B-ALDIS A SA A 1H | 14,000 | Drill (horizontal) | BARTON, K W, A-3 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-30 | DEVON ENERGY PRODUCTION CO, L.P. | SLONE B-FRIEDEL B SA B 2H | 14,000 | Drill (horizontal) | BARTON, K W, A-3 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-30 | DEVON ENERGY PRODUCTION CO, L.P. | SLONE B-FRIEDEL B SA A 1H | 14,000 | Drill (horizontal) | BARTON, K W, A-3 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-25 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 1 | 17,535 | Recompletion | POWEL, J, A-658 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-24 | BPX OPERATING COMPANY | FISHER C-FISHER B SA 7 7H | 14,000 | Drill (horizontal) | CROPPER, E G, A-132Bottom hole: RATTEKIN, J A, A-409 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-23 | VERDUN OIL & GAS LLC | LAMB UNIT A 3H | 14,000 | Drill (horizontal) | BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-23 | VERDUN OIL & GAS LLC | LAMB UNIT A 2H | 14,000 | Drill (horizontal) | BARTON, K W, A-3 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-23 | BURLINGTON RESOURCES O & G CO LP | BURGE UNIT A 2 | 13,068 | Recompletion | FASSETT, F, A-707, Sec 22 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-22 | BURLINGTON RESOURCES O & G CO LP | RUCKMAN RANCH UNIT 20 | 12,769 | Recompletion | POWEL, J, A-658 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-17 | BURLINGTON RESOURCES O & G CO LP | BARNHART UNIT A 1 | 12,129 | Recompletion | BIRD, J, A-60 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-14 | BURLINGTON RESOURCES O & G CO LP | VEIT-BAROS ULW 1 | 12,168 | Recompletion | PATE, P, A-386Bottom hole: PATE, P, A-374 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-11 | BPX OPERATING COMPANY | SANDY A-A. J. BAKER A SA 4 4H | 14,000 | Drill (horizontal) | T. MANCHA, A-326Bottom hole: GONZALES, F, A-194 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-11 | BURLINGTON RESOURCES O & G CO LP | KLAEVEMANN UNIT A USW 2 | 12,748 | Recompletion | I RR CO, A-273, Sec 17 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-11 | BURLINGTON RESOURCES O & G CO LP | BARNHART UNIT B 1 | 12,045 | Recompletion | BIRD, J, A-60 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-10 | BURLINGTON RESOURCES O & G CO LP | WRIGHT UNIT A 1 | 12,782 | Recompletion | I RR CO/MARTIN, R E, A-532, Sec 64Bottom hole: HUNTER, W W, A-224 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-08 | MARATHON OIL EF LLC | EDWARD ROEDER-JAMES GANO SA1 1H | 17,500 | Drill (horizontal) | HILL, W G, A-223Bottom hole: HOLLIEN, J F, A-235 | DE WITT (EAGLE FORD SHALE) |
| 2025-07-03 | BPX OPERATING COMPANY | FISHER C-FISHER B SA 6 6H | 14,000 | Drill (horizontal) | CROPPER, E G, A-132Bottom hole: WHITEHEAD, N, A-489 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-03 | BPX OPERATING COMPANY | FISHER C-FISHER B SA 5 5H | 14,000 | Drill (horizontal) | CROPPER, E G, A-132Bottom hole: WHITEHEAD, N, A-489 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-03 | BPX OPERATING COMPANY | FISHER C-FISHER B SA 4 4H | 14,000 | Drill (horizontal) | CROPPER, E G, A-132Bottom hole: WHITEHEAD, N, A-489 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-03 | BURLINGTON RESOURCES O & G CO LP | KUCK UNIT A 1 | 12,386 | Recompletion | DAVIS, D, A-12Bottom hole: FULCHER, G, A-21 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-03 | DEVON ENERGY PRODUCTION CO, L.P. | BIG OAK A 4H | 14,000 | Drill (horizontal) | MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-03 | BURLINGTON RESOURCES O & G CO LP | SEIDEL UNIT A 3 | 13,099 | Recompletion | BENTON, D, A-67Bottom hole: WHITEHEAD, N, A-489 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-02 | BURLINGTON RESOURCES O & G CO LP | PILGRIM UNIT A 1 | 12,580 | Recompletion | PARMER, R, A-382Bottom hole: PATE, P, A-386 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-01 | BURLINGTON RESOURCES O & G CO LP | GUNN UNIT A 1 | 12,286 | Recompletion | DAVIS, D, A-12 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-01 | DEVON ENERGY PRODUCTION CO, L.P. | BIG OAK B 7H | 14,000 | Drill (horizontal) | MIDDLETON, S P, A-36Bottom hole: CLEMENTS, J D, A-10 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-07-01 | BURLINGTON RESOURCES O & G CO LP | MUSSELMAN UNIT A 1 | 12,491 | Recompletion | DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | BPX OPERATING COMPANY | H SISTERS B-H SISTERS A SA 5 5H | 14,000 | Drill (horizontal) | I RR CO/BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / EDWARDS, E, A-605, Sec 8 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | BPX OPERATING COMPANY | H SISTERS B-H SISTERS A SA 4 4H | 14,000 | Drill (horizontal) | I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | BPX OPERATING COMPANY | H SISTERS B-H SISTERS A SA 3 3H | 14,000 | Drill (horizontal) | I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | BPX OPERATING COMPANY | H SISTERS B 13H | 14,000 | Drill (horizontal) | I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / KASPRIZK, J, A-528, Sec 8 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | BPX OPERATING COMPANY | H SISTERS B-H SISTERS A SA 2 2H | 14,000 | Drill (horizontal) | I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | BPX OPERATING COMPANY | H SISTERS B-H SISTERS A SA 1 1H | 14,000 | Drill (horizontal) | I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | DEVON ENERGY PRODUCTION CO, L.P. | BIG OAK A 6H | 14,000 | Drill (horizontal) | MIDDLETON, S P, A-36Bottom hole: CLEMENTS, J D, A-10 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | DEVON ENERGY PRODUCTION CO, L.P. | BIG OAK A 5H | 14,000 | Drill (horizontal) | MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | DEVON ENERGY PRODUCTION CO, L.P. | J-HERMANN E - BIG OAK A SA D 4H | 14,000 | Drill (horizontal) | S.P. MIDDLETON SURVEY, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | DEVON ENERGY PRODUCTION CO, L.P. | J-HERMANN E - BIG OAK A SA C 3H | 14,000 | Drill (horizontal) | MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | DEVON ENERGY PRODUCTION CO, L.P. | J-HERMANN E - BIG OAK A SA B 2H | 14,000 | Drill (horizontal) | MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | DEVON ENERGY PRODUCTION CO, L.P. | J-HERMANN E - BIG OAK A SA A 1H | 14,000 | Drill (horizontal) | MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | DEVON ENERGY PRODUCTION CO, L.P. | J-HERMANN E 3H | 14,000 | Drill (horizontal) | S.P. MIDDLETON SURVEY, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | MARATHON OIL EF LLC | EDWARD ROEDER-MIGURA A SA1 1H | 17,500 | Drill (horizontal) | HILL, W G, A-223Bottom hole: WHARTON, J, A-475 | DE WITT (EAGLE FORD SHALE) |
| 2025-06-30 | BPX OPERATING COMPANY | SANDY A 12H | 14,000 | Drill (horizontal) | MANCHA, T, A-326 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | BPX OPERATING COMPANY | SANDY A-A. J. BAKER A SA 3 3H | 14,000 | Drill (horizontal) | MANCHA, T, A-326Bottom hole: GONZALES, F, A-194 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | BPX OPERATING COMPANY | SANDY A-A. J. BAKER A SA 2 2H | 14,000 | Drill (horizontal) | MANCHA, T, A-326Bottom hole: GONZALES, F, A-194 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-30 | BPX OPERATING COMPANY | SANDY A-A. J. BAKER A SA 1 1H | 14,000 | Drill (horizontal) | MANCHA, T, A-326Bottom hole: GONZALES, F, A-194 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-27 | DEVON ENERGY PRODUCTION CO, L.P. | J-HERMANN E 2H | 14,000 | Drill (horizontal) | MIDDLETON, S P, A-36 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-27 | BURLINGTON RESOURCES O & G CO LP | PILGRIM UNIT B 1 | 12,203 | Recompletion | PARMER, R, A-382Bottom hole: PATE, P, A-374 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-27 | BURLINGTON RESOURCES O & G CO LP | H&H UNIT B 1 | 12,277 | Recompletion | HARRIS, A J, A-220Bottom hole: HARRIS, A J, A-461 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-26 | BURLINGTON RESOURCES O & G CO LP | HARTMAN UNIT A 2 | 13,782 | Recompletion | QUINN, W, A-394 | SUGARKANE (EAGLE FORD) |
| 2025-06-26 | BPX OPERATING COMPANY | GEFFERT A-GWOSDZ A SA 1 1H | 14,000 | Drill (horizontal) | I RR CO / LACKEY, S C, A-588, Sec 46Bottom hole: I RR CO, A-259, Sec 43 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-24 | BURLINGTON RESOURCES O & G CO LP | BURGE UNIT A USW 1 | 17,500 | Recompletion | I RR CO, A-276, Sec 23Bottom hole: I RR CO, A-275, Sec 21 | DE WITT (EAGLE FORD SHALE) |
| 2025-06-18 | BURLINGTON RESOURCES O & G CO LP | HILMER KOOPMANN A 274 6 | 13,209 | Recompletion | I RR CO, A-275, Sec 21 | DE WITT (EAGLE FORD SHALE) |
| 2025-06-18 | BURLINGTON RESOURCES O & G CO LP | J SMITH UNIT A 901 | 13,131 | Recompletion | I RR CO, A-267, Sec 57Bottom hole: I RR CO/ BUSCHICK, H, A-689, Sec 62 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-18 | BURLINGTON RESOURCES O & G CO LP | SCHENDEL A-303 NO. 1 1 | 12,877 | Recompletion | LYTTE, W L, A-303 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-16 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR E 16H | 14,000 | Drill (horizontal) | FULCHER, C, A-20 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-16 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR E 15H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-16 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR E 14H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-16 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR E 13H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-16 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR E 12H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-16 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR E 11H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-16 | DEVON ENERGY PRODUCTION CO, L.P. | MUIR E 10H | 14,000 | Drill (horizontal) | FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213 | EAGLEVILLE (EAGLE FORD-2) |
| 2025-06-05 | BURLINGTON RESOURCES O & G CO LP | MARALDO A-403 2 | 13,085 | Recompletion | SPELLMAN, F H, A-452 | DE WITT (EAGLE FORD SHALE) |
See the permit itself
You can open any of these permits on the RRC’s drilling permit query (search by operator and lease name), or look at where wells sit on a map in the RRC’s public GIS viewer. Our DeWitt County page has the county’s production, top leases and operators and a well map.
Source: Texas Railroad Commission drilling permit data (end-of-month files and the daily file); data date: RRC Drilling Permit daily file, downloaded Nov 27, 2026. Each permit is listed once, with its latest filing. Total depth, type, location and fields are as the operator filed them with the RRC; field names come from the RRC field table in its Production Data Query dump. Verify on the RRC before you rely on any of it.