Extrxct
Data as of Aug 2026 production (Jul 2026–Aug 2026 provisional) · permits through Nov 25, 2026 · Source: Texas Railroad Commission · Methodology
Home / Counties / DeWitt County / Drilling permits

DeWitt County drilling permits

The Texas Railroad Commission issued 300 drilling permits in DeWitt County from June 2025 through Nov 25, 2026. 264 are for new holes (2 vertical, 0 directional and 262 horizontal) and 36 are for work on existing wells, such as recompletions and re-entries. The deepest is ENSIGN NATURAL RESOURCES II LLC MUSSELMAN-MUDD A 1H, permitted to 24,000 feet.

If you own minerals here and want to know what is happening near your land, you’re in the right place. The permits below list the survey, abstract, block and section where each well is to be drilled, which is how mineral owners usually describe a tract, so you can filter the table for yours. Not sure of your abstract number? Our guide on how to find drilling activity near your tract walks through it.

300permits, June 2025–Nov 2026
264for new holes
262horizontal
300permitted to 10,000 ft or deeper

Deepest permits in DeWitt County

Total depth is the depth the operator applied for, so it shows how deep the operator plans to drill, not where the well will produce. The fields listed on a permit are the RRC fields the operator named for the well. A field name often includes a formation, as in Wescott (Strawn), but the list can include several fields and it doesn’t by itself confirm which zone the operator is targeting.

IssuedOperatorLease and wellTotal depth (ft)TypeSurvey, abstract, block, sectionFields listed on the permit
2026-11-16ENSIGN NATURAL RESOURCES II LLCMUSSELMAN-MUDD A 1H24,000Drill (horizontal)DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2026-08-21ENSIGN NATURAL RESOURCES II LLCSTEEN-MUSSELMAN F 6H23,500Drill (horizontal)DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2026-08-21ENSIGN NATURAL RESOURCES II LLCSTEEN-STEEN E 5H23,500Drill (horizontal)DAVIS, D, A-12Bottom hole: FULCHER, G, A-21EAGLEVILLE (EAGLE FORD-2)
2026-08-26ENSIGN NATURAL RESOURCES II LLCSTEEN-MUSSELMAN G 7H23,500Drill (horizontal)DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2026-08-26ENSIGN NATURAL RESOURCES II LLCSTEEN-MUSSELMAN H 8H23,000Drill (horizontal)DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2025-07-25BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 117,535RecompletionPOWEL, J, A-658EAGLEVILLE (EAGLE FORD-2)
2025-06-24BURLINGTON RESOURCES O & G CO LPBURGE UNIT A USW 117,500RecompletionI RR CO, A-276, Sec 23Bottom hole: I RR CO, A-275, Sec 21DE WITT (EAGLE FORD SHALE)
2025-06-30MARATHON OIL EF LLCEDWARD ROEDER-MIGURA A SA1 1H17,500Drill (horizontal)HILL, W G, A-223Bottom hole: WHARTON, J, A-475DE WITT (EAGLE FORD SHALE)
2025-07-08MARATHON OIL EF LLCEDWARD ROEDER-JAMES GANO SA1 1H17,500Drill (horizontal)HILL, W G, A-223Bottom hole: HOLLIEN, J F, A-235DE WITT (EAGLE FORD SHALE)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW M 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW L 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW K 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW J 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW I 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-08-06BURLINGTON RESOURCES O & G CO LPMOORE-TURBO-WEST USW D 117,500Drill (horizontal)HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23EAGLEVILLE (EAGLE FORD-2)

All DeWitt County permits since June 2025

IssuedOperatorLease and wellTotal depth (ft)TypeSurvey, abstract, block, sectionFields listed on the permit
2026-11-20BURLINGTON RESOURCES O & G CO LPFRANZ-PENTA SA A 117,500Drill (horizontal)I RR CO, A-270, Sec 11Bottom hole: HALL, J, A-217DE WITT (EAGLE FORD SHALE)
2026-11-16ENSIGN NATURAL RESOURCES II LLCMUSSELMAN-MUDD A 1H24,000Drill (horizontal)DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2026-11-06BURLINGTON RESOURCES O & G CO LPFRANZ-MATACOWORCA SA J 117,500Drill (horizontal)I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9DE WITT (EAGLE FORD SHALE)
2026-11-06BURLINGTON RESOURCES O & G CO LPFRANZ-MATACOWORCA SA I 117,500Drill (horizontal)I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9DE WITT (EAGLE FORD SHALE)
2026-11-06BURLINGTON RESOURCES O & G CO LPFRANZ-MATACOWORCA SA H 117,500Drill (horizontal)I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9DE WITT (EAGLE FORD SHALE)
2026-11-03BURLINGTON RESOURCES O & G CO LPFRANZ-MATACOWORCA SA G 217,500Drill (horizontal)I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9DE WITT (EAGLE FORD SHALE)
2026-11-03BURLINGTON RESOURCES O & G CO LPFRANZ-MATACOWORCA SA G 117,500Drill (horizontal)I RR CO, A-270, Sec 11Bottom hole: I RR CO, A-249, Sec 9DE WITT (EAGLE FORD SHALE)
2026-11-03BURLINGTON RESOURCES O & G CO LPN STEINMANN UNIT A 317,500Drill (horizontal)COOK, H P, A-120Bottom hole: COX, S, A-131DE WITT (EAGLE FORD SHALE)
2026-10-22BURLINGTON RESOURCES O & G CO LPN STEINMANN UNIT A 617,500Drill (horizontal)COOK, H P, A-120Bottom hole: COX, S, A-131DE WITT (EAGLE FORD SHALE)
2026-10-21BURLINGTON RESOURCES O & G CO LPN STEINMANN UNIT A 517,500Drill (horizontal)COOK, H P, A-120DE WITT (EAGLE FORD SHALE)
2026-10-21BURLINGTON RESOURCES O & G CO LPN STEINMANN UNIT A 417,500Drill (horizontal)COOK, H P, A-120Bottom hole: COX, S, A-131DE WITT (EAGLE FORD SHALE)
2026-10-21BURLINGTON RESOURCES O & G CO LPN STEINMANN UNIT A 717,500Drill (horizontal)COOK, H P, A-120Bottom hole: COX, S, A-131DE WITT (EAGLE FORD SHALE)
2026-10-15ENSIGN NATURAL RESOURCES II LLCHENDERSON 12H13,300Drill (horizontal)STUMP, J S, A-430EAGLEVILLE (EAGLE FORD-2)
2026-10-15ENSIGN NATURAL RESOURCES II LLCHENDERSON 11H13,300Drill (horizontal)STUMP, J S, A-430EAGLEVILLE (EAGLE FORD-2)
2026-10-13CRESCENT ENERGY OPERATING, LLCTURKEY BOTTOM-MCKEE 1H14,000Drill (horizontal)KIZER, B P, A-286Bottom hole: HUGHES, J, A-29EAGLEVILLE (EAGLE FORD-2)
2026-10-09BURLINGTON RESOURCES O & G CO LPFRANZ UNIT A 517,500Drill (horizontal)I RR CO, A-270, Sec 11DE WITT (EAGLE FORD SHALE)
2026-10-07BURLINGTON RESOURCES O & G CO LPFRANZ UNIT A 617,500Drill (horizontal)I RR CO, A-270, Sec 11DE WITT (EAGLE FORD SHALE)
2026-10-06BURLINGTON RESOURCES O & G CO LPFRANZ UNIT A 817,500Drill (horizontal)I RR CO, A-270, Sec 11DE WITT (EAGLE FORD SHALE)
2026-10-06BURLINGTON RESOURCES O & G CO LPFRANZ UNIT A 717,500Drill (horizontal)I RR CO, A-270, Sec 11Bottom hole: I. RR. CO., A-270DE WITT (EAGLE FORD SHALE)
2026-10-01RUSK ENERGY OPERATING LLCKAHLICH GAS UNIT 111,000Drill (vertical)CALLIHAN, J T, A-110WILDCAT
2026-10-01CRESCENT ENERGY OPERATING, LLCCHUMCHAL-LOOS 8H14,000Drill (horizontal)KIZER, B P, A-286Bottom hole: SA&MG RR CO, A-447EAGLEVILLE (EAGLE FORD-2)
2026-09-30CRESCENT ENERGY OPERATING, LLCTURKEY BOTTOM-ADAMEK A 2H14,000Drill (horizontal)KIZER, B P, A-286EAGLEVILLE (EAGLE FORD-2)
2026-09-30CRESCENT ENERGY OPERATING, LLCTURKEY BOTTOM-ADAMEK A 201H14,000Drill (horizontal)KIZER, B P, A-286SUGARKANE (AUSTIN CHALK)
2026-09-30CRESCENT ENERGY OPERATING, LLCCHUMCHAL UNIT 202H14,000Drill (horizontal)KIZER, B P, A-286Bottom hole: SA&MG RR CO, A-447SUGARKANE (AUSTIN CHALK)
2026-09-25BURLINGTON RESOURCES O & G CO LPN STEINMANN UNIT A 217,500Drill (horizontal)COOK, H P, A-120Bottom hole: COX, S, A-131DE WITT (EAGLE FORD SHALE)
2026-09-16BPX OPERATING COMPANYW. BUTLER A-LP BUTLER B SA 4 4H13,500Drill (horizontal)BARRIER, A B, A-642Bottom hole: WRIGHT, R, A-478EAGLEVILLE (EAGLE FORD-2)
2026-09-16BPX OPERATING COMPANYW. BUTLER A-E. BUTLER A SA 7 7H13,500Drill (horizontal)BARRIER, A B, A-642Bottom hole: WRIGHT, R, A-478EAGLEVILLE (EAGLE FORD-2)
2026-09-16BPX OPERATING COMPANYW. BUTLER A-E. BUTLER A SA 6 6H13,500Drill (horizontal)BARRIER, A B, A-642Bottom hole: WRIGHT, R, A-478EAGLEVILLE (EAGLE FORD-2)
2026-09-16BPX OPERATING COMPANYW. BUTLER A-E. BUTLER A SA 5 5H13,500Drill (horizontal)BARRIER, A B, A-642Bottom hole: WRIGHT, R, A-478EAGLEVILLE (EAGLE FORD-2)
2026-08-31BPX OPERATING COMPANYW. BUTLER A 13H13,500Drill (horizontal)BARRIER, A B, A-642Bottom hole: LYTTE, W L, A-303EAGLEVILLE (EAGLE FORD-2)
2026-08-26ENSIGN NATURAL RESOURCES II LLCSTEEN-MUSSELMAN H 8H23,000Drill (horizontal)DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2026-08-26ENSIGN NATURAL RESOURCES II LLCSTEEN-MUSSELMAN G 7H23,500Drill (horizontal)DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2026-08-25BPX OPERATING COMPANYW. BUTLER A 16H13,500Drill (horizontal)BARRIER, A B, A-642Bottom hole: LYTTE, W L, A-303EAGLEVILLE (EAGLE FORD-2)
2026-08-25BPX OPERATING COMPANYW. BUTLER A 14H13,500Drill (horizontal)BARRIER, A B, A-642Bottom hole: LYTTE, W L, A-303EAGLEVILLE (EAGLE FORD-2)
2026-08-25BPX OPERATING COMPANYW. BUTLER A 15H13,500Drill (horizontal)BARRIER, A B, A-642Bottom hole: LYTTE, W L, A-303EAGLEVILLE (EAGLE FORD-2)
2026-08-21ENSIGN NATURAL RESOURCES II LLCSTEEN-MUSSELMAN F 6H23,500Drill (horizontal)DAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2026-08-21ENSIGN NATURAL RESOURCES II LLCSTEEN-STEEN E 5H23,500Drill (horizontal)DAVIS, D, A-12Bottom hole: FULCHER, G, A-21EAGLEVILLE (EAGLE FORD-2)
2026-07-29BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 2917,500Drill (horizontal)POWEL, J, A-658EAGLEVILLE (EAGLE FORD-2)
2026-07-24BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 4617,500Drill (horizontal)POWEL, J, A-658Bottom hole: BULLOCK, W C, A-31EAGLEVILLE (EAGLE FORD-2)
2026-07-24BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 4517,500Drill (horizontal)POWEL, J, A-658Bottom hole: BULLOCK, W C, A-31EAGLEVILLE (EAGLE FORD-2)
2026-07-23BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 4317,500Drill (horizontal)POWEL, J, A-658Bottom hole: BULLOCK, W C, A-31EAGLEVILLE (EAGLE FORD-2)
2026-07-23BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 4117,500Drill (horizontal)POWEL, J, A-658Bottom hole: BULLOCK, W C, A-31EAGLEVILLE (EAGLE FORD-2)
2026-07-23BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 2817,500Drill (horizontal)POWEL, J, A-658EAGLEVILLE (EAGLE FORD-2)
2026-07-23BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 2717,500Drill (horizontal)POWEL, J, A-658EAGLEVILLE (EAGLE FORD-2)
2026-07-10DEVON ENERGY PRODUCTION CO, L.P.HEIBEL A 16H14,000Drill (horizontal)B. FULCHER, A-190Bottom hole: FULCHER, G, A-21EAGLEVILLE (EAGLE FORD-2)
2026-07-10DEVON ENERGY PRODUCTION CO, L.P.HEIBEL A 15H14,000Drill (horizontal)B. FULCHER, A-190Bottom hole: FULCHER, G, A-21EAGLEVILLE (EAGLE FORD-2)
2026-07-10DEVON ENERGY PRODUCTION CO, L.P.HEIBEL A 14H14,000Drill (horizontal)B. FULCHER, A-190EAGLEVILLE (EAGLE FORD-2)
2026-07-10DEVON ENERGY PRODUCTION CO, L.P.HEIBEL A 13H14,000Drill (horizontal)B. FULCHER, A-190Bottom hole: FULCHER, G, A-21EAGLEVILLE (EAGLE FORD-2)
2026-07-10DEVON ENERGY PRODUCTION CO, L.P.HEIBEL A 12H14,000Drill (horizontal)B. FULCHER, A-190Bottom hole: FULCHER, G, A-21EAGLEVILLE (EAGLE FORD-2)
2026-07-10DEVON ENERGY PRODUCTION CO, L.P.HEIBEL A 11H14,000Drill (horizontal)B. FULCHER, A-190Bottom hole: FULCHER, G, A-21EAGLEVILLE (EAGLE FORD-2)
2026-07-10DEVON ENERGY PRODUCTION CO, L.P.HEIBEL A 10H14,000Drill (horizontal)B. FULCHER, A-190Bottom hole: FULCHER, G, A-21EAGLEVILLE (EAGLE FORD-2)
2026-07-01MARATHON OIL EF LLCSCHORLEMER QUAD SA A 117,500Drill (horizontal)HURST, S D, A-222Bottom hole: KING, J A, A-288DE WITT (EAGLE FORD SHALE)
2026-06-30MARATHON OIL EF LLCHOPE-DWOR-SAUN B SA A 117,500Drill (horizontal)CARSON, S B, A-113Bottom hole: I RR CO/BUSCHICK, H, A-577, Sec 42DE WITT (EAGLE FORD SHALE)
2026-06-29MARATHON OIL EF LLCHOPE-SAUNDERS B SA E 117,500Drill (horizontal)CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39DE WITT (EAGLE FORD SHALE)
2026-06-29MARATHON OIL EF LLCHOPE-SAUNDERS B SA D 117,500Drill (horizontal)CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39DE WITT (EAGLE FORD SHALE)
2026-06-29MARATHON OIL EF LLCHOPE-SAUNDERS B SA C 117,500Drill (horizontal)CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39DE WITT (EAGLE FORD SHALE)
2026-06-29MARATHON OIL EF LLCHOPE-SAUNDERS B SA B 117,500Drill (horizontal)CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39DE WITT (EAGLE FORD SHALE)
2026-06-29MARATHON OIL EF LLCHOPE-SAUNDERS B SA A 117,500Drill (horizontal)CARSON, S B, A-113Bottom hole: I RR CO, A-257, Sec 39DE WITT (EAGLE FORD SHALE)
2026-06-26DEVON ENERGY PRODUCTION CO, L.P.MUIR E-MUIR D SA A 1H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2026-06-25DEVON ENERGY PRODUCTION CO, L.P.MUIR C 6H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2026-06-25DEVON ENERGY PRODUCTION CO, L.P.MUIR C 5H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2026-06-25DEVON ENERGY PRODUCTION CO, L.P.MUIR B 8H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2026-06-25DEVON ENERGY PRODUCTION CO, L.P.MUIR B 7H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2026-06-25DEVON ENERGY PRODUCTION CO, L.P.MUIR B 5H14,000Drill (horizontal)FULCHER, C, A-20EAGLEVILLE (EAGLE FORD-2)
2026-06-25DEVON ENERGY PRODUCTION CO, L.P.MUIR B 4H14,000Drill (horizontal)FULCHER, C, A-20EAGLEVILLE (EAGLE FORD-2)
2026-06-19BURLINGTON RESOURCES O & G CO LPC W HAHN-RICE 1 SA G 117,500Drill (horizontal)I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-268, Sec 61EAGLEVILLE (EAGLE FORD-2)
2026-06-19BURLINGTON RESOURCES O & G CO LPC W HAHN-RICE 1 SA F 117,500Drill (horizontal)I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO/LACKEY, S C, A-693, Sec 62EAGLEVILLE (EAGLE FORD-2)
2026-06-19BURLINGTON RESOURCES O & G CO LPC W HAHN-RICE 1 SA E 117,500Drill (horizontal)I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO/LACKEY, S C, A-693, Sec 62EAGLEVILLE (EAGLE FORD-2)
2026-06-19BURLINGTON RESOURCES O & G CO LPC W HAHN-MEI-RIC SA D 117,500Drill (horizontal)I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-260, Sec 45EAGLEVILLE (EAGLE FORD-2)
2026-06-19BURLINGTON RESOURCES O & G CO LPR MEISCHEN-RICE SA C 117,500Drill (horizontal)I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-260, Sec 45EAGLEVILLE (EAGLE FORD-2)
2026-06-19BURLINGTON RESOURCES O & G CO LPR MEISCHEN-RICE SA B 117,500Drill (horizontal)I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-260, Sec 45EAGLEVILLE (EAGLE FORD-2)
2026-06-19BURLINGTON RESOURCES O & G CO LPR MEISCHEN-RICE SA A 117,500Drill (horizontal)I RR CO/SCHNEIDER, J JR, A-546, Sec 48Bottom hole: I RR CO, A-260, Sec 45EAGLEVILLE (EAGLE FORD-2)
2026-06-15BURLINGTON RESOURCES O & G CO LPSAUNDERS UNIT B 1417,500Drill (horizontal)I RR CO, A-257, Sec 39DE WITT (EAGLE FORD SHALE)
2026-06-15BURLINGTON RESOURCES O & G CO LPSAUNDERS UNIT B 1317,500Drill (horizontal)I RR CO, A-257, Sec 39DE WITT (EAGLE FORD SHALE)
2026-06-15MARATHON OIL EF LLCSCHORLEMER-CHAR SA A 117,500Drill (horizontal)HURST, S D, A-222Bottom hole: KING, J A, A-288DE WITT (EAGLE FORD SHALE)
2026-06-12BPX OPERATING COMPANYWARREN B-WARREN A SA 1 1H14,000Drill (horizontal)PARMER, R, A-382Bottom hole: COOK, H P, A-120EAGLEVILLE (EAGLE FORD-2)
2026-06-10HURD ENTERPRISES, LTD.BEARD ETAL GU 111,500Drill (vertical)DOWLAN, P, A-152WILDCAT; MISSION VALLEY, W. (WILCOX G); MISSION VALLEY, W.(WILCOX 10600)
2026-05-27DEVON ENERGY PRODUCTION CO, L.P.GUEVARA B - CREEK SA B 2H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: MILLS, R, A-39EAGLEVILLE (EAGLE FORD-2)
2026-05-27DEVON ENERGY PRODUCTION CO, L.P.GUEVARA B - CREEK SA A 1H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: MILLS, R, A-39EAGLEVILLE (EAGLE FORD-2)
2026-05-27DEVON ENERGY PRODUCTION CO, L.P.ULRICH A-PEEB A-GUEV B-CRK SA A 1H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: MILLS, R, A-39EAGLEVILLE (EAGLE FORD-2)
2026-05-27DEVON ENERGY PRODUCTION CO, L.P.PEEBLES A - CREEK SA A 1H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: MILLS, R, A-39EAGLEVILLE (EAGLE FORD-2)
2026-05-19BPX OPERATING COMPANYWARREN B-WARREN A SA 4 4H14,000Drill (horizontal)PARMER, R, A-382Bottom hole: COOK, H P, A-120EAGLEVILLE (EAGLE FORD-2)
2026-05-19BPX OPERATING COMPANYWARREN B-WARREN A SA 3 3H14,000Drill (horizontal)PARMER, R, A-382Bottom hole: COOK, H P, A-120EAGLEVILLE (EAGLE FORD-2)
2026-05-19BPX OPERATING COMPANYWARREN B-WARREN A SA 2 2H14,000Drill (horizontal)PARMER, R, A-382Bottom hole: COOK, H P, A-120EAGLEVILLE (EAGLE FORD-2)
2026-05-06BPX OPERATING COMPANYWARREN B 9H14,000Drill (horizontal)PARMER, R, A-382Bottom hole: COOK, H P, A-120EAGLEVILLE (EAGLE FORD-2)
2026-05-05DEVON ENERGY PRODUCTION CO, L.P.PEEBLES A 10H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: FULCHER, C, A-20DE WITT (EAGLE FORD SHALE)
2026-04-24DEVON ENERGY PRODUCTION CO, L.P.RUPPERT A 23H14,000Drill (horizontal)BELL, T C, A-65Bottom hole: TAYLOR, C, A-279EAGLEVILLE (EAGLE FORD-2)
2026-04-23DEVON ENERGY PRODUCTION CO, L.P.RUPPERT A-G KLEIN-JOHNSON A SA A 1H14,000Drill (horizontal)BELL, T C, A-65Bottom hole: TAYLOR, C, A-279EAGLEVILLE (EAGLE FORD-2)
2026-04-23DEVON ENERGY PRODUCTION CO, L.P.RUPPERT A-JOHNSON A SA A 1H14,000Drill (horizontal)BELL, T C, A-65Bottom hole: TAYLOR, C, A-279EAGLEVILLE (EAGLE FORD-2)
2026-04-02BURLINGTON RESOURCES O & G CO LPLL A JANSKY A USW L 117,500Drill (horizontal)I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55EAGLEVILLE (EAGLE FORD-2)
2026-04-01DEVON ENERGY PRODUCTION CO, L.P.CANTU B-HYATT A SA A 1H14,000Drill (horizontal)TRAVIS DAVIS, A-162EAGLEVILLE (EAGLE FORD-2)
2026-04-01DEVON ENERGY PRODUCTION CO, L.P.CANTU B 22H14,000Drill (horizontal)DAVIS, T, A-162EAGLEVILLE (EAGLE FORD-2)
2026-04-01DEVON ENERGY PRODUCTION CO, L.P.CANTU B 20H14,000Drill (horizontal)DAVIS, T, A-162EAGLEVILLE (EAGLE FORD-2)
2026-04-01DEVON ENERGY PRODUCTION CO, L.P.CANTU B 19H14,000Drill (horizontal)DAVIS, T, A-162EAGLEVILLE (EAGLE FORD-2)
2026-04-01DEVON ENERGY PRODUCTION CO, L.P.CANTU B 17H14,000Drill (horizontal)DAVIS, T, A-162EAGLEVILLE (EAGLE FORD-2)
2026-04-01DEVON ENERGY PRODUCTION CO, L.P.CANTU B 16H14,000Drill (horizontal)DAVIS, T, A-162EAGLEVILLE (EAGLE FORD-2)
2026-04-01DEVON ENERGY PRODUCTION CO, L.P.CANTU B 15H14,000Drill (horizontal)DAVIS, T, A-162EAGLEVILLE (EAGLE FORD-2)
2026-04-01DEVON ENERGY PRODUCTION CO, L.P.CANTU B 14H14,000Drill (horizontal)DAVIS, T, A-162EAGLEVILLE (EAGLE FORD-2)
2026-04-01DEVON ENERGY PRODUCTION CO, L.P.CANTU B 13H14,000Drill (horizontal)DAVIS, T, A-162EAGLEVILLE (EAGLE FORD-2)
2026-03-31BURLINGTON RESOURCES O & G CO LPLL-QUAD ULW A 117,500Drill (horizontal)I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55EAGLEVILLE (EAGLE FORD-2)
2026-03-30BURLINGTON RESOURCES O & G CO LPLL A JANSKY A USW K 117,500Drill (horizontal)I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55EAGLEVILLE (EAGLE FORD-2)
2026-03-30BURLINGTON RESOURCES O & G CO LPLL A JANSKY A USW J 117,500Drill (horizontal)I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55EAGLEVILLE (EAGLE FORD-2)
2026-03-30BURLINGTON RESOURCES O & G CO LPLL A JANSKY A USW H 117,500Drill (horizontal)I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55EAGLEVILLE (EAGLE FORD-2)
2026-03-30BURLINGTON RESOURCES O & G CO LPLL A JANSKY A USW G 117,500Drill (horizontal)I RR CO, A-267, Sec 57Bottom hole: I RR CO, A-265, Sec 55EAGLEVILLE (EAGLE FORD-2)
2026-03-30BURLINGTON RESOURCES O & G CO LPCULPEPPER-BURGE USW E 117,500Drill (horizontal)I RR CO, A-267, Sec 57Bottom hole: FASSETT, F, A-707, Sec 22EAGLEVILLE (EAGLE FORD-2)
2026-03-26BURLINGTON RESOURCES O & G CO LPCULPEPPER-BURGE USW D 117,500Drill (horizontal)I RR CO, A-267, Sec 57Bottom hole: FASSETT, F, A-707, Sec 22EAGLEVILLE (EAGLE FORD-2)
2026-03-26BURLINGTON RESOURCES O & G CO LPSAUNDERS UNIT A 1217,500Drill (horizontal)I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83DE WITT (EAGLE FORD SHALE)
2026-03-26BURLINGTON RESOURCES O & G CO LPSAUNDERS UNIT A 1317,500Drill (horizontal)I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83DE WITT (EAGLE FORD SHALE)
2026-03-26BURLINGTON RESOURCES O & G CO LPSAUNDERS UNIT A 1017,500Drill (horizontal)I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83DE WITT (EAGLE FORD SHALE)
2026-03-26BURLINGTON RESOURCES O & G CO LPSAUNDERS UNIT A 1117,500Drill (horizontal)I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83DE WITT (EAGLE FORD SHALE)
2026-03-26BURLINGTON RESOURCES O & G CO LPSAUNDERS UNIT A 917,500Drill (horizontal)I RR CO, A-258, Sec 41Bottom hole: BLAIR, E J, A-83DE WITT (EAGLE FORD SHALE)
2026-02-12BPX OPERATING COMPANYCANTU A BPX 8H12,810RecompletionMEISSNER, J, A-345EAGLEVILLE (EAGLE FORD-2)
2026-02-12BPX OPERATING COMPANYCANTU A BPX 5H13,047RecompletionMEISSNER, J, A-345Bottom hole: PARMER, R, A-382EAGLEVILLE (EAGLE FORD-2)
2026-02-12BPX OPERATING COMPANYCANTU A BPX 3H13,046RecompletionMEISSNER, J, A-345Bottom hole: PARMER, R, A-382EAGLEVILLE (EAGLE FORD-2)
2026-02-10BURLINGTON RESOURCES O & G CO LPSCHMIDT-MUSCH-JOHN USW C 117,500Drill (horizontal)I RR CO, A-268, Sec 61Bottom hole: I&GN RR CO, A-462EAGLEVILLE (EAGLE FORD-2)
2026-02-10BURLINGTON RESOURCES O & G CO LPSCHMIDT-MUSCH-JOHN USW B 117,500Drill (horizontal)I RR CO, A-268, Sec 61Bottom hole: I&GN RR CO, A-462EAGLEVILLE (EAGLE FORD-2)
2026-02-10BURLINGTON RESOURCES O & G CO LPSCHMIDT-MUSCHALEK USW A 117,500Drill (horizontal)I RR CO, A-268, Sec 61Bottom hole: I&GN RR CO, A-278EAGLEVILLE (EAGLE FORD-2)
2026-02-10BPX OPERATING COMPANYCANTU A BPX-KICKENDAHL 1 SA 8 8H14,000Drill (horizontal)MEISSNER, J, A-345Bottom hole: COX, S, A-131EAGLEVILLE (EAGLE FORD-2)
2026-02-10BPX OPERATING COMPANYCANTU A BPX-KICKENDAHL 1 SA 7 7H14,000Drill (horizontal)MEISSNER, J, A-345Bottom hole: COX, S, A-131EAGLEVILLE (EAGLE FORD-2)
2026-02-06BURLINGTON RESOURCES O & G CO LPSCHMIDT UNIT A 417,500Drill (horizontal)I RR CO, A-268, Sec 61Bottom hole: I RR CO, A-269, Sec 63EAGLEVILLE (EAGLE FORD-2)
2026-02-06BURLINGTON RESOURCES O & G CO LPSCHMIDT UNIT A 317,500Drill (horizontal)I RR CO, A-268, Sec 61Bottom hole: I RR CO, A-269, Sec 63EAGLEVILLE (EAGLE FORD-2)
2026-02-06BURLINGTON RESOURCES O & G CO LPSCHMIDT UNIT A 217,500Drill (horizontal)I RR CO, A-268, Sec 61Bottom hole: I RR CO, A-269, Sec 63EAGLEVILLE (EAGLE FORD-2)
2026-02-06BPX OPERATING COMPANYCANTU A BPX 16H14,000Drill (horizontal)MEISSNER, J, A-345EAGLEVILLE (EAGLE FORD-2)
2026-02-06BPX OPERATING COMPANYCANTU A BPX 15H14,000Drill (horizontal)MEISSNER, J, A-345EAGLEVILLE (EAGLE FORD-2)
2026-02-06BPX OPERATING COMPANYCANTU A BPX 14H14,000Drill (horizontal)MEISSNER, J, A-345Bottom hole: COOK, H P, A-120EAGLEVILLE (EAGLE FORD-2)
2026-02-06DEVON ENERGY PRODUCTION CO, L.P.BOYSEN B - S. WITTE A SA A 1H14,000Drill (horizontal)SINCLAIR, R, A-429EAGLEVILLE (EAGLE FORD-2)
2026-02-06DEVON ENERGY PRODUCTION CO, L.P.A. WITTE A 5H14,000Drill (horizontal)SINCLAIR, R, A-429EAGLEVILLE (EAGLE FORD-2)
2026-02-05BURLINGTON RESOURCES O & G CO LPP CRAIN-STAN SA C 117,500Drill (horizontal)HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19DE WITT (EAGLE FORD SHALE)
2026-02-05BURLINGTON RESOURCES O & G CO LPP CRAIN-STAN SA B 317,500Drill (horizontal)HALL, J, A-217Bottom hole: HALL, J, A-274DE WITT (EAGLE FORD SHALE)
2026-02-05BURLINGTON RESOURCES O & G CO LPP CRAIN-STAN SA B 217,500Drill (horizontal)HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19DE WITT (EAGLE FORD SHALE)
2026-02-05BURLINGTON RESOURCES O & G CO LPP CRAIN-STAN SA B 117,500Drill (horizontal)HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19DE WITT (EAGLE FORD SHALE)
2026-02-05BURLINGTON RESOURCES O & G CO LPP CRAIN-STAN SA A 317,500Drill (horizontal)HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19DE WITT (EAGLE FORD SHALE)
2026-02-05BURLINGTON RESOURCES O & G CO LPP CRAIN-STAN SA A 217,500Drill (horizontal)HALL, J, A-217Bottom hole: I RR CO, A-274, Sec 19DE WITT (EAGLE FORD SHALE)
2026-02-05BURLINGTON RESOURCES O & G CO LPP CRAIN-STAN SA A 117,500Drill (horizontal)HALL, J, A-217Bottom hole: HALL, J, A-274DE WITT (EAGLE FORD SHALE)
2026-02-05BPX OPERATING COMPANYCANTU A BPX-HARTMAN A SA 9 9H14,000Drill (horizontal)MEISSNER, J, A-345Bottom hole: COX, S, A-131EAGLEVILLE (EAGLE FORD-2)
2026-02-05BPX OPERATING COMPANYCANTU A BPX-HARTMAN A SA 6 6H14,000Drill (horizontal)MEISSNER, J, A-345Bottom hole: COOK, H P, A-120EAGLEVILLE (EAGLE FORD-2)
2026-02-05BPX OPERATING COMPANYCANTU A BPX-HARTMAN A SA 5 5H14,000Drill (horizontal)MEISSNER, J, A-345Bottom hole: COX, S, A-131EAGLEVILLE (EAGLE FORD-2)
2026-02-05BPX OPERATING COMPANYCANTU A BPX-HARTMAN A SA 4 4H14,000Drill (horizontal)MEISSNER, J, A-345Bottom hole: COX, S, A-131EAGLEVILLE (EAGLE FORD-2)
2026-02-05DEVON ENERGY PRODUCTION CO, L.P.BOYSEN B - S. WITTE A SA E 5H14,000Drill (horizontal)SINCLAIR, R, A-429EAGLEVILLE (EAGLE FORD-2)
2026-02-05DEVON ENERGY PRODUCTION CO, L.P.BOYSEN B - S. WITTE A SA D 4H14,000Drill (horizontal)SINCLAIR, R, A-429EAGLEVILLE (EAGLE FORD-2)
2026-02-05DEVON ENERGY PRODUCTION CO, L.P.BOYSEN B - S. WITTE A SA C 3H14,000Drill (horizontal)SINCLAIR, R, A-429EAGLEVILLE (EAGLE FORD-2)
2026-02-05DEVON ENERGY PRODUCTION CO, L.P.BOYSEN B - S. WITTE A SA B 2H14,000Drill (horizontal)SINCLAIR, R, A-429EAGLEVILLE (EAGLE FORD-2)
2026-01-27BURLINGTON RESOURCES O & G CO LPHAHN-D CIL-MAUR-SEI ULW I 117,500Drill (horizontal)ROBERSON, W, A-401Bottom hole: BENTON, D, A-67EAGLEVILLE (EAGLE FORD-2)
2026-01-27BURLINGTON RESOURCES O & G CO LPHAHN-D CIL-SEI USW G 117,500Drill (horizontal)ROBERSON, W, A-401Bottom hole: DONOHO, J, A-142EAGLEVILLE (EAGLE FORD-2)
2026-01-27BURLINGTON RESOURCES O & G CO LPHAHN-D CIL-SEI USW E 117,500Drill (horizontal)ROBERSON, W, A-401Bottom hole: DONOHO, J, A-142EAGLEVILLE (EAGLE FORD-2)
2026-01-27BURLINGTON RESOURCES O & G CO LPHAHN-D CIL USW H 117,500Drill (horizontal)ROBERSON, W, A-401Bottom hole: BENTON, D, A-67EAGLEVILLE (EAGLE FORD-2)
2026-01-23BURLINGTON RESOURCES O & G CO LPHAHN-D CIL-SEI USW F 117,500Drill (horizontal)ROBERSON, W, A-401Bottom hole: DONOHO, J, A-142EAGLEVILLE (EAGLE FORD-2)
2026-01-22DEVON ENERGY PRODUCTION CO, L.P.WILLIAMS A-ULRICH A-GUEV AB SA A 1H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-22DEVON ENERGY PRODUCTION CO, L.P.WILLIAMS A-STEIN A-SHEPPA A SA A 1H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-22DEVON ENERGY PRODUCTION CO, L.P.WILLIAMS A-STEIN-GUEVA A SA A 1H14,000Drill (horizontal)MC COY, J JR, A-30EAGLEVILLE (EAGLE FORD-2)
2026-01-21REPSOL OIL & GAS USA, LLCTHIEME-SMITH-SEILER (SA) A5 A 5H14,000Drill (horizontal)I RR CO, A-250, Sec 25Bottom hole: HILL, W G, A-223SUGARKANE (EAGLE FORD)
2026-01-21REPSOL OIL & GAS USA, LLCTHIEME-SMITH-BILM-SEILER (SA) A4 A 4H14,000Drill (horizontal)I RR CO, A-250, Sec 25Bottom hole: HILL, W G, A-223SUGARKANE (EAGLE FORD)
2026-01-21REPSOL OIL & GAS USA, LLCTHIEME-SMITH-BILMARK (SA) A3 A 3H14,000Drill (horizontal)I RR CO, A-250, Sec 25Bottom hole: HILL, W G, A-223SUGARKANE (EAGLE FORD)
2026-01-21REPSOL OIL & GAS USA, LLCTHIEME-SMITH-BILMARK (SA) A2 A 2H14,000Drill (horizontal)I RR CO, A-250, Sec 25Bottom hole: HILL, W G, A-223SUGARKANE (EAGLE FORD)
2026-01-15BPX OPERATING COMPANYSEIFERT B-SEIFERT C SA 2 2H14,000Drill (horizontal)HACKNEY, F N, A-650Bottom hole: MC LANE, N, A-654EAGLEVILLE (EAGLE FORD-2)
2026-01-14DEVON ENERGY PRODUCTION CO, L.P.WILLIAMS A - GUEVARA A SA C 3H14,000Drill (horizontal)MC COY, J JR, A-30EAGLEVILLE (EAGLE FORD-2)
2026-01-14DEVON ENERGY PRODUCTION CO, L.P.STEINMANN A - SHEPPARD A SA F 6H14,000Drill (horizontal)J. MCCOY, JR., A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-14DEVON ENERGY PRODUCTION CO, L.P.STEINMANN A - SHEPPARD A SA D 4H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-14DEVON ENERGY PRODUCTION CO, L.P.STEINMANN A - SHEPPARD A SA C 3H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-14DEVON ENERGY PRODUCTION CO, L.P.STEINMANN A - SHEPPARD A SA B 2H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-14DEVON ENERGY PRODUCTION CO, L.P.STEINMANN A - SHEPPARD A SA A 1H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-13DEVON ENERGY PRODUCTION CO, L.P.WILLIAMS A - GUEVARA A SA B 2H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-13DEVON ENERGY PRODUCTION CO, L.P.WILLIAMS A - GUEVARA A SA A 1H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-13DEVON ENERGY PRODUCTION CO, L.P.WILLIAMS A 6H14,000Drill (horizontal)MC COY, J JR, A-30EAGLEVILLE (EAGLE FORD-2)
2026-01-13DEVON ENERGY PRODUCTION CO, L.P.WILLIAMS A 5H14,000Drill (horizontal)J. MCCOY, JR., A-30EAGLEVILLE (EAGLE FORD-2)
2026-01-12DEVON ENERGY PRODUCTION CO, L.P.STEINMANN A - SHEPPARD A SA E 5H14,000Drill (horizontal)MC COY, J JR, A-30Bottom hole: BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2026-01-12BURLINGTON RESOURCES O & G CO LPFRISBIE HEXA USW A 117,500Drill (horizontal)HUNTER, W W, A-224Bottom hole: I RR CO/STAYTON, J W, A-675, Sec 56EAGLEVILLE (EAGLE FORD-2)
2026-01-12BURLINGTON RESOURCES O & G CO LPFRISBIE-LL A 639 B USW A 117,500Drill (horizontal)HUNTER, W W, A-224Bottom hole: I RR CO / FASSETT, F, A-639, Sec 58EAGLEVILLE (EAGLE FORD-2)
2026-01-09BPX OPERATING COMPANYSEIFERT B 12H14,000Drill (horizontal)HACKNEY, F N, A-650Bottom hole: FOSTER, I R, A-648EAGLEVILLE (EAGLE FORD-2)
2026-01-09BPX OPERATING COMPANYSEIFERT B 11H14,000Drill (horizontal)F.N. HACKNEY, A-650Bottom hole: J. STRICKLAND, A-664EAGLEVILLE (EAGLE FORD-2)
2025-12-16BURLINGTON RESOURCES O & G CO LPFRISBIE UNIT A 317,500Drill (horizontal)HUNTER, W W, A-224Bottom hole: I RR CO, A-267, Sec 57EAGLEVILLE (EAGLE FORD-2)
2025-12-04BURLINGTON RESOURCES O & G CO LPGOHLKE UNIT A 213,724RecompletionLEAL, F, A-304DE WITT (EAGLE FORD SHALE)
2025-12-03BURLINGTON RESOURCES O & G CO LPBUTLER UNIT D 213,517RecompletionLEAL, F, A-304DE WITT (EAGLE FORD SHALE)
2025-12-02DEVON ENERGY PRODUCTION CO, L.P.HANSEN A 9H14,000Drill (horizontal)HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-11-24DEVON ENERGY PRODUCTION CO, L.P.CARSON A - ELDER B SA A 1H14,000Drill (horizontal)WYNN, R H, A-474Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-1)
2025-11-24BPX OPERATING COMPANYH SISTERS B-H SISTERS A SA 6 6H14,000Drill (horizontal)I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6EAGLEVILLE (EAGLE FORD-2)
2025-11-07DEVON ENERGY PRODUCTION CO, L.P.MUIR D 16H14,000Drill (horizontal)J. HARWOOD, A-213EAGLEVILLE (EAGLE FORD-2)
2025-11-05DEVON ENERGY PRODUCTION CO, L.P.HANSEN A 16H14,000Drill (horizontal)HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-11-05DEVON ENERGY PRODUCTION CO, L.P.HANSEN A 15H14,000Drill (horizontal)HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-11-05DEVON ENERGY PRODUCTION CO, L.P.HANSEN A 13H14,000Drill (horizontal)HARWOOD, J, A-213Bottom hole: T&NO RR CO, A-213, Blk 1T, Sec 191EAGLEVILLE (EAGLE FORD-2)
2025-11-05DEVON ENERGY PRODUCTION CO, L.P.HANSEN A 12H14,000Drill (horizontal)J. HARWOOD, A-213EAGLEVILLE (EAGLE FORD-2)
2025-11-05DEVON ENERGY PRODUCTION CO, L.P.HANSEN A 11H14,000Drill (horizontal)HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-11-05DEVON ENERGY PRODUCTION CO, L.P.HANSEN A 10H14,000Drill (horizontal)J. HARWOOD, A-213EAGLEVILLE (EAGLE FORD-2)
2025-10-23BPX OPERATING COMPANYNELSON A-CASKEY A SA 7 7H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114EAGLEVILLE (EAGLE FORD-2)
2025-10-23BURLINGTON RESOURCES O & G CO LPWARZECHA UNIT A 212,761RecompletionROBERSON, W, A-401Bottom hole: COOK, H P, A-120EAGLEVILLE (EAGLE FORD-2)
2025-10-22BPX OPERATING COMPANYNELSON A-CASKEY A SA 6 6H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114EAGLEVILLE (EAGLE FORD-2)
2025-10-22BPX OPERATING COMPANYNELSON A-CASKEY A SA 5 5H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114EAGLEVILLE (EAGLE FORD-2)
2025-10-22BPX OPERATING COMPANYNELSON A-CASKEY A SA 4 4H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114EAGLEVILLE (EAGLE FORD-2)
2025-10-22BPX OPERATING COMPANYNELSON A-CASKEY A SA 3 3H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114EAGLEVILLE (EAGLE FORD-2)
2025-10-22BPX OPERATING COMPANYNELSON A-CASKEY B SA 2 2H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475EAGLEVILLE (EAGLE FORD-2)
2025-10-15BURLINGTON RESOURCES O & G CO LPHAM-HOOKS-WILD USW J 117,500Drill (horizontal)ROSS, J E, A-405Bottom hole: WAIT, J, A-490DE WITT (EAGLE FORD SHALE)
2025-10-15BURLINGTON RESOURCES O & G CO LPHAM-HOOKS-WILD USW I 117,500Drill (horizontal)ROSS, J E, A-405Bottom hole: WAIT, J, A-490DE WITT (EAGLE FORD SHALE)
2025-10-15BURLINGTON RESOURCES O & G CO LPHAM-HOOKS-WILD USW H 117,500Drill (horizontal)ROSS, J E, A-405Bottom hole: WAIT, J, A-490DE WITT (EAGLE FORD SHALE)
2025-10-13BURLINGTON RESOURCES O & G CO LPHAMILTON TRUST UNIT B 217,500Drill (horizontal)ROSS, J E, A-405DE WITT (EAGLE FORD SHALE)
2025-10-07BURLINGTON RESOURCES O & G CO LPADIX UNIT A 313,494RecompletionFASSETT, F, A-707, Sec 22Bottom hole: I RR CO / BUCK, J C, A-513, Sec 20DE WITT (EAGLE FORD SHALE)
2025-10-06BURLINGTON RESOURCES O & G CO LPSTRAUBE UNIT A 613,335RecompletionFASSETT, F, A-707, Sec 22Bottom hole: HALL, J, A-217DE WITT (EAGLE FORD SHALE)
2025-10-06BURLINGTON RESOURCES O & G CO LPSTRAUBE UNIT A 713,400RecompletionFASSETT, F, A-707, Sec 22Bottom hole: HALL, J, A-217DE WITT (EAGLE FORD SHALE)
2025-10-06BURLINGTON RESOURCES O & G CO LPSTRAUBE UNIT A 413,407RecompletionFASSETT, F, A-707, Sec 22DE WITT (EAGLE FORD SHALE)
2025-10-06BURLINGTON RESOURCES O & G CO LPHAM-HOOKS-WILD ULW A 117,500Drill (horizontal)ROSS, J E, A-405Bottom hole: PENICK, T M, A-536DE WITT (EAGLE FORD SHALE)
2025-09-23DEVON ENERGY PRODUCTION CO, L.P.CARSON A 14H14,000Drill (horizontal)WYNN, R H, A-474Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-1)
2025-09-19DEVON ENERGY PRODUCTION CO, L.P.ELDER B 19H14,000Drill (horizontal)WYNN, R H, A-474Bottom hole: FULCHER, C, A-20EAGLEVILLE (EAGLE FORD-2)
2025-09-18DEVON ENERGY PRODUCTION CO, L.P.CARSON A 17H14,000Drill (horizontal)WYNN, R H, A-474Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-1)
2025-09-18BURLINGTON RESOURCES O & G CO LPHAM-HOOKS-WILD USW G 117,500Drill (horizontal)ROSS, J E, A-405Bottom hole: WAIT, J, A-490DE WITT (EAGLE FORD SHALE)
2025-09-18BURLINGTON RESOURCES O & G CO LPHAM-HOOKS-WILD USW F 117,500Drill (horizontal)ROSS, J E, A-405Bottom hole: MEP&P RR CO, A-359DE WITT (EAGLE FORD SHALE)
2025-09-18BURLINGTON RESOURCES O & G CO LPMOTL UNIT A 113,390RecompletionPHARRASS, S, A-377Bottom hole: FENNELL, J, A-18DE WITT (EAGLE FORD SHALE)
2025-09-18BURLINGTON RESOURCES O & G CO LPRICE UNIVERISTY 313,041RecompletionI RR CO / LACKEY, S C, A-588, Sec 46Bottom hole: I RR CO, A-260, Sec 45EAGLEVILLE (EAGLE FORD-2)
2025-09-17DEVON ENERGY PRODUCTION CO, L.P.CARSON A 13H14,000Drill (horizontal)WYNN, R H, A-474Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-1)
2025-09-08BURLINGTON RESOURCES O & G CO LPWILD-HOOKS-HAM USW E 117,500Drill (horizontal)WAIT, J, A-490Bottom hole: CAPLES, E, A-121DE WITT (EAGLE FORD SHALE)
2025-09-08BURLINGTON RESOURCES O & G CO LPWILD-HOOKS USW A 117,500Drill (horizontal)WAIT, J, A-490Bottom hole: MEP&P RR CO, A-359DE WITT (EAGLE FORD SHALE)
2025-08-29BURLINGTON RESOURCES O & G CO LPWILD-HOOKS USW D 117,500Drill (horizontal)WAIT, J, A-490Bottom hole: MEP&P RR CO, A-359DE WITT (EAGLE FORD SHALE)
2025-08-29BURLINGTON RESOURCES O & G CO LPWILD-HOOKS USW C 117,500Drill (horizontal)WAIT, J, A-490Bottom hole: MEP&P RR CO, A-359DE WITT (EAGLE FORD SHALE)
2025-08-29BURLINGTON RESOURCES O & G CO LPWILD-HOOKS USW B 117,500Drill (horizontal)WAIT, J, A-490Bottom hole: MEP&P RR CO, A-359DE WITT (EAGLE FORD SHALE)
2025-08-29DEVON ENERGY PRODUCTION CO, L.P.D. BOOTHE A-POHLER A AC 1H14,000Drill (horizontal)CLEMENTS, J D, A-10Bottom hole: BEST, HRS R, A-79SUGARKANE (AUSTIN CHALK)
2025-08-27BPX OPERATING COMPANYNELSON A-CASKEY B SA 8 8H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475EAGLEVILLE (EAGLE FORD-2)
2025-08-27DEVON ENERGY PRODUCTION CO, L.P.WITTE A-JACOBS A-BOENING AW D 4H14,000Drill (horizontal)CLEMENTS, J D, A-10EAGLEVILLE (EAGLE FORD-2)
2025-08-27DEVON ENERGY PRODUCTION CO, L.P.WITTE A-JACOBS A-BOENING AW C 3H14,000Drill (horizontal)CLEMENTS, J D, A-10EAGLEVILLE (EAGLE FORD-2)
2025-08-27DEVON ENERGY PRODUCTION CO, L.P.WITTE A-JACOBS A-BOENING AW B 2H14,000Drill (horizontal)CLEMENTS, J D, A-10EAGLEVILLE (EAGLE FORD-2)
2025-08-27DEVON ENERGY PRODUCTION CO, L.P.WITTE A-JACOBS A-BOENING AW A 1H14,000Drill (horizontal)CLEMENTS, J D, A-10Bottom hole: READ, J, A-538EAGLEVILLE (EAGLE FORD-2)
2025-08-27DEVON ENERGY PRODUCTION CO, L.P.WITTE A 2H14,000Drill (horizontal)CLEMENTS, J D, A-10EAGLEVILLE (EAGLE FORD-2)
2025-08-18BPX OPERATING COMPANYLANIK B-LANIK A SA 7 7H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475EAGLEVILLE (EAGLE FORD-2)
2025-08-18BPX OPERATING COMPANYLANIK B-LANIK A SA 6 6H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475EAGLEVILLE (EAGLE FORD-2)
2025-08-18BPX OPERATING COMPANYLANIK B-LANIK A SA 5 5H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: WHARTON, J, A-475EAGLEVILLE (EAGLE FORD-2)
2025-08-18BPX OPERATING COMPANYLANIK B-LANIK A SA 4 4H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114EAGLEVILLE (EAGLE FORD-2)
2025-08-15BPX OPERATING COMPANYLANIK B-LANIK A SA 3 3H14,000Drill (horizontal)NOWLAN, J, A-372Bottom hole: CHURMLEY, T, A-114EAGLEVILLE (EAGLE FORD-2)
2025-08-13BURLINGTON RESOURCES O & G CO LPWARZECHA UNIT A 112,711RecompletionROBERSON, W, A-401Bottom hole: COOK, H P, A-120EAGLEVILLE (EAGLE FORD-2)
2025-08-13DEVON ENERGY PRODUCTION CO, L.P.MARIE A - LANE A SA A 1H14,000Drill (horizontal)WAIT, J, A-490Bottom hole: WENTWORTH, T, A-49DE WITT (EAGLE FORD SHALE)
2025-08-13DEVON ENERGY PRODUCTION CO, L.P.MARIE A 5H14,000Drill (horizontal)WAIT, J, A-490Bottom hole: MOSS, E, A-40DE WITT (EAGLE FORD SHALE)
2025-08-13DEVON ENERGY PRODUCTION CO, L.P.MARIE A 4H14,000Drill (horizontal)WAIT, J, A-490Bottom hole: MOSS, E, A-40DE WITT (EAGLE FORD SHALE)
2025-08-13BURLINGTON RESOURCES O & G CO LPJUSTISS UNIT C 112,130RecompletionAMADOR, R, A-1EAGLEVILLE (EAGLE FORD-2)
2025-08-06BURLINGTON RESOURCES O & G CO LPMOORE-TURBO-WEST USW D 117,500Drill (horizontal)HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23EAGLEVILLE (EAGLE FORD-2)
2025-08-06BURLINGTON RESOURCES O & G CO LPMOORE-TURBO-WEST USW C 117,500Drill (horizontal)HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23EAGLEVILLE (EAGLE FORD-2)
2025-08-06BURLINGTON RESOURCES O & G CO LPMOORE-TURBO-WEST USW B 117,500Drill (horizontal)HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23EAGLEVILLE (EAGLE FORD-2)
2025-08-06BURLINGTON RESOURCES O & G CO LPMOORE-TURBO-WEST USW A 117,500Drill (horizontal)HOLDEMAN, J T, A-623Bottom hole: I RR CO, A-276, Sec 23EAGLEVILLE (EAGLE FORD-2)
2025-08-04BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 812,903RecompletionPOWEL, J, A-658EAGLEVILLE (EAGLE FORD-2)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW M 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW L 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW K 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW J 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-07-31BURLINGTON RESOURCES O & G CO LPBUTLER B-HART A USW I 117,500Drill (horizontal)LEAL, F, A-304Bottom hole: QUINN, W, A-394DE WITT (EAGLE FORD SHALE)
2025-07-30DEVON ENERGY PRODUCTION CO, L.P.WILLIAMS B-ALDIS A SA A 1H14,000Drill (horizontal)BARTON, K W, A-3DE WITT (EAGLE FORD SHALE)
2025-07-30DEVON ENERGY PRODUCTION CO, L.P.SLONE B-FRIEDEL B SA B 2H14,000Drill (horizontal)BARTON, K W, A-3DE WITT (EAGLE FORD SHALE)
2025-07-30DEVON ENERGY PRODUCTION CO, L.P.SLONE B-FRIEDEL B SA A 1H14,000Drill (horizontal)BARTON, K W, A-3DE WITT (EAGLE FORD SHALE)
2025-07-25BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 117,535RecompletionPOWEL, J, A-658EAGLEVILLE (EAGLE FORD-2)
2025-07-24BPX OPERATING COMPANYFISHER C-FISHER B SA 7 7H14,000Drill (horizontal)CROPPER, E G, A-132Bottom hole: RATTEKIN, J A, A-409EAGLEVILLE (EAGLE FORD-2)
2025-07-23VERDUN OIL & GAS LLCLAMB UNIT A 3H14,000Drill (horizontal)BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2025-07-23VERDUN OIL & GAS LLCLAMB UNIT A 2H14,000Drill (horizontal)BARTON, K W, A-3EAGLEVILLE (EAGLE FORD-2)
2025-07-23BURLINGTON RESOURCES O & G CO LPBURGE UNIT A 213,068RecompletionFASSETT, F, A-707, Sec 22DE WITT (EAGLE FORD SHALE)
2025-07-22BURLINGTON RESOURCES O & G CO LPRUCKMAN RANCH UNIT 2012,769RecompletionPOWEL, J, A-658EAGLEVILLE (EAGLE FORD-2)
2025-07-17BURLINGTON RESOURCES O & G CO LPBARNHART UNIT A 112,129RecompletionBIRD, J, A-60EAGLEVILLE (EAGLE FORD-2)
2025-07-14BURLINGTON RESOURCES O & G CO LPVEIT-BAROS ULW 112,168RecompletionPATE, P, A-386Bottom hole: PATE, P, A-374EAGLEVILLE (EAGLE FORD-2)
2025-07-11BPX OPERATING COMPANYSANDY A-A. J. BAKER A SA 4 4H14,000Drill (horizontal)T. MANCHA, A-326Bottom hole: GONZALES, F, A-194EAGLEVILLE (EAGLE FORD-2)
2025-07-11BURLINGTON RESOURCES O & G CO LPKLAEVEMANN UNIT A USW 212,748RecompletionI RR CO, A-273, Sec 17EAGLEVILLE (EAGLE FORD-2)
2025-07-11BURLINGTON RESOURCES O & G CO LPBARNHART UNIT B 112,045RecompletionBIRD, J, A-60EAGLEVILLE (EAGLE FORD-2)
2025-07-10BURLINGTON RESOURCES O & G CO LPWRIGHT UNIT A 112,782RecompletionI RR CO/MARTIN, R E, A-532, Sec 64Bottom hole: HUNTER, W W, A-224EAGLEVILLE (EAGLE FORD-2)
2025-07-08MARATHON OIL EF LLCEDWARD ROEDER-JAMES GANO SA1 1H17,500Drill (horizontal)HILL, W G, A-223Bottom hole: HOLLIEN, J F, A-235DE WITT (EAGLE FORD SHALE)
2025-07-03BPX OPERATING COMPANYFISHER C-FISHER B SA 6 6H14,000Drill (horizontal)CROPPER, E G, A-132Bottom hole: WHITEHEAD, N, A-489EAGLEVILLE (EAGLE FORD-2)
2025-07-03BPX OPERATING COMPANYFISHER C-FISHER B SA 5 5H14,000Drill (horizontal)CROPPER, E G, A-132Bottom hole: WHITEHEAD, N, A-489EAGLEVILLE (EAGLE FORD-2)
2025-07-03BPX OPERATING COMPANYFISHER C-FISHER B SA 4 4H14,000Drill (horizontal)CROPPER, E G, A-132Bottom hole: WHITEHEAD, N, A-489EAGLEVILLE (EAGLE FORD-2)
2025-07-03BURLINGTON RESOURCES O & G CO LPKUCK UNIT A 112,386RecompletionDAVIS, D, A-12Bottom hole: FULCHER, G, A-21EAGLEVILLE (EAGLE FORD-2)
2025-07-03DEVON ENERGY PRODUCTION CO, L.P.BIG OAK A 4H14,000Drill (horizontal)MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2025-07-03BURLINGTON RESOURCES O & G CO LPSEIDEL UNIT A 313,099RecompletionBENTON, D, A-67Bottom hole: WHITEHEAD, N, A-489EAGLEVILLE (EAGLE FORD-2)
2025-07-02BURLINGTON RESOURCES O & G CO LPPILGRIM UNIT A 112,580RecompletionPARMER, R, A-382Bottom hole: PATE, P, A-386EAGLEVILLE (EAGLE FORD-2)
2025-07-01BURLINGTON RESOURCES O & G CO LPGUNN UNIT A 112,286RecompletionDAVIS, D, A-12EAGLEVILLE (EAGLE FORD-2)
2025-07-01DEVON ENERGY PRODUCTION CO, L.P.BIG OAK B 7H14,000Drill (horizontal)MIDDLETON, S P, A-36Bottom hole: CLEMENTS, J D, A-10EAGLEVILLE (EAGLE FORD-2)
2025-07-01BURLINGTON RESOURCES O & G CO LPMUSSELMAN UNIT A 112,491RecompletionDAVIS, D, A-12Bottom hole: MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2025-06-30BPX OPERATING COMPANYH SISTERS B-H SISTERS A SA 5 5H14,000Drill (horizontal)I RR CO/BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / EDWARDS, E, A-605, Sec 8EAGLEVILLE (EAGLE FORD-2)
2025-06-30BPX OPERATING COMPANYH SISTERS B-H SISTERS A SA 4 4H14,000Drill (horizontal)I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6EAGLEVILLE (EAGLE FORD-2)
2025-06-30BPX OPERATING COMPANYH SISTERS B-H SISTERS A SA 3 3H14,000Drill (horizontal)I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6EAGLEVILLE (EAGLE FORD-2)
2025-06-30BPX OPERATING COMPANYH SISTERS B 13H14,000Drill (horizontal)I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / KASPRIZK, J, A-528, Sec 8EAGLEVILLE (EAGLE FORD-2)
2025-06-30BPX OPERATING COMPANYH SISTERS B-H SISTERS A SA 2 2H14,000Drill (horizontal)I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6EAGLEVILLE (EAGLE FORD-2)
2025-06-30BPX OPERATING COMPANYH SISTERS B-H SISTERS A SA 1 1H14,000Drill (horizontal)I RR CO / BLACKWELL, W, A-507, Sec 10Bottom hole: I RR CO / WILSON, J E, A-557, Sec 6EAGLEVILLE (EAGLE FORD-2)
2025-06-30DEVON ENERGY PRODUCTION CO, L.P.BIG OAK A 6H14,000Drill (horizontal)MIDDLETON, S P, A-36Bottom hole: CLEMENTS, J D, A-10EAGLEVILLE (EAGLE FORD-2)
2025-06-30DEVON ENERGY PRODUCTION CO, L.P.BIG OAK A 5H14,000Drill (horizontal)MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2025-06-30DEVON ENERGY PRODUCTION CO, L.P.J-HERMANN E - BIG OAK A SA D 4H14,000Drill (horizontal)S.P. MIDDLETON SURVEY, A-36EAGLEVILLE (EAGLE FORD-2)
2025-06-30DEVON ENERGY PRODUCTION CO, L.P.J-HERMANN E - BIG OAK A SA C 3H14,000Drill (horizontal)MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2025-06-30DEVON ENERGY PRODUCTION CO, L.P.J-HERMANN E - BIG OAK A SA B 2H14,000Drill (horizontal)MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2025-06-30DEVON ENERGY PRODUCTION CO, L.P.J-HERMANN E - BIG OAK A SA A 1H14,000Drill (horizontal)MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2025-06-30DEVON ENERGY PRODUCTION CO, L.P.J-HERMANN E 3H14,000Drill (horizontal)S.P. MIDDLETON SURVEY, A-36EAGLEVILLE (EAGLE FORD-2)
2025-06-30MARATHON OIL EF LLCEDWARD ROEDER-MIGURA A SA1 1H17,500Drill (horizontal)HILL, W G, A-223Bottom hole: WHARTON, J, A-475DE WITT (EAGLE FORD SHALE)
2025-06-30BPX OPERATING COMPANYSANDY A 12H14,000Drill (horizontal)MANCHA, T, A-326EAGLEVILLE (EAGLE FORD-2)
2025-06-30BPX OPERATING COMPANYSANDY A-A. J. BAKER A SA 3 3H14,000Drill (horizontal)MANCHA, T, A-326Bottom hole: GONZALES, F, A-194EAGLEVILLE (EAGLE FORD-2)
2025-06-30BPX OPERATING COMPANYSANDY A-A. J. BAKER A SA 2 2H14,000Drill (horizontal)MANCHA, T, A-326Bottom hole: GONZALES, F, A-194EAGLEVILLE (EAGLE FORD-2)
2025-06-30BPX OPERATING COMPANYSANDY A-A. J. BAKER A SA 1 1H14,000Drill (horizontal)MANCHA, T, A-326Bottom hole: GONZALES, F, A-194EAGLEVILLE (EAGLE FORD-2)
2025-06-27DEVON ENERGY PRODUCTION CO, L.P.J-HERMANN E 2H14,000Drill (horizontal)MIDDLETON, S P, A-36EAGLEVILLE (EAGLE FORD-2)
2025-06-27BURLINGTON RESOURCES O & G CO LPPILGRIM UNIT B 112,203RecompletionPARMER, R, A-382Bottom hole: PATE, P, A-374EAGLEVILLE (EAGLE FORD-2)
2025-06-27BURLINGTON RESOURCES O & G CO LPH&H UNIT B 112,277RecompletionHARRIS, A J, A-220Bottom hole: HARRIS, A J, A-461EAGLEVILLE (EAGLE FORD-2)
2025-06-26BURLINGTON RESOURCES O & G CO LPHARTMAN UNIT A 213,782RecompletionQUINN, W, A-394SUGARKANE (EAGLE FORD)
2025-06-26BPX OPERATING COMPANYGEFFERT A-GWOSDZ A SA 1 1H14,000Drill (horizontal)I RR CO / LACKEY, S C, A-588, Sec 46Bottom hole: I RR CO, A-259, Sec 43EAGLEVILLE (EAGLE FORD-2)
2025-06-24BURLINGTON RESOURCES O & G CO LPBURGE UNIT A USW 117,500RecompletionI RR CO, A-276, Sec 23Bottom hole: I RR CO, A-275, Sec 21DE WITT (EAGLE FORD SHALE)
2025-06-18BURLINGTON RESOURCES O & G CO LPHILMER KOOPMANN A 274 613,209RecompletionI RR CO, A-275, Sec 21DE WITT (EAGLE FORD SHALE)
2025-06-18BURLINGTON RESOURCES O & G CO LPJ SMITH UNIT A 90113,131RecompletionI RR CO, A-267, Sec 57Bottom hole: I RR CO/ BUSCHICK, H, A-689, Sec 62EAGLEVILLE (EAGLE FORD-2)
2025-06-18BURLINGTON RESOURCES O & G CO LPSCHENDEL A-303 NO. 1 112,877RecompletionLYTTE, W L, A-303EAGLEVILLE (EAGLE FORD-2)
2025-06-16DEVON ENERGY PRODUCTION CO, L.P.MUIR E 16H14,000Drill (horizontal)FULCHER, C, A-20EAGLEVILLE (EAGLE FORD-2)
2025-06-16DEVON ENERGY PRODUCTION CO, L.P.MUIR E 15H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-06-16DEVON ENERGY PRODUCTION CO, L.P.MUIR E 14H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-06-16DEVON ENERGY PRODUCTION CO, L.P.MUIR E 13H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-06-16DEVON ENERGY PRODUCTION CO, L.P.MUIR E 12H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-06-16DEVON ENERGY PRODUCTION CO, L.P.MUIR E 11H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-06-16DEVON ENERGY PRODUCTION CO, L.P.MUIR E 10H14,000Drill (horizontal)FULCHER, C, A-20Bottom hole: HARWOOD, J, A-213EAGLEVILLE (EAGLE FORD-2)
2025-06-05BURLINGTON RESOURCES O & G CO LPMARALDO A-403 213,085RecompletionSPELLMAN, F H, A-452DE WITT (EAGLE FORD SHALE)

See the permit itself

You can open any of these permits on the RRC’s drilling permit query (search by operator and lease name), or look at where wells sit on a map in the RRC’s public GIS viewer. Our DeWitt County page has the county’s production, top leases and operators and a well map.

Source: Texas Railroad Commission drilling permit data (end-of-month files and the daily file); data date: RRC Drilling Permit daily file, downloaded Nov 27, 2026. Each permit is listed once, with its latest filing. Total depth, type, location and fields are as the operator filed them with the RRC; field names come from the RRC field table in its Production Data Query dump. Verify on the RRC before you rely on any of it.