Gregg County drilling permits
The Texas Railroad Commission issued 18 drilling permits in Gregg County from June 2025 through Nov 25, 2026. 9 are for new holes (0 vertical, 0 directional and 9 horizontal) and 9 are for work on existing wells, such as recompletions and re-entries. The deepest is SABINE ENERGY INC. HAMBY HEIRS D (AW) 4H, permitted to 12,000 feet.
If you own minerals here and want to know what is happening near your land, you’re in the right place. The permits below list the survey, abstract, block and section where each well is to be drilled, which is how mineral owners usually describe a tract, so you can filter the table for yours. Not sure of your abstract number? Our guide on how to find drilling activity near your tract walks through it.
Deepest permits in Gregg County
Total depth is the depth the operator applied for, so it shows how deep the operator plans to drill, not where the well will produce. The fields listed on a permit are the RRC fields the operator named for the well. A field name often includes a formation, as in Wescott (Strawn), but the list can include several fields and it doesn’t by itself confirm which zone the operator is targeting.
| Issued | Operator | Lease and well | Total depth (ft) | Type | Survey, abstract, block, section | Fields listed on the permit |
|---|---|---|---|---|---|---|
| 2025-07-16 | SABINE ENERGY INC. | HAMBY HEIRS D (AW) 4H | 12,000 | Drill (horizontal) | LOUT, J, A-123, Sec 96Bottom hole: CRANE, R T, A-46, Sec 232 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-07-18 | SABINE ENERGY INC. | HAMBY HEIRS B (AW) 2H | 12,000 | Drill (horizontal) | LOUT, J, A-123, Sec 96Bottom hole: BENTON, D, A-31, Sec 233 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-08-08 | SABINE ENERGY INC. | HAMBY HEIRS C (AW) 3H | 12,000 | Drill (horizontal) | LOUT, J, A-123, Sec 96 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-08-11 | SABINE ENERGY INC. | HAMBY HEIRS A (AW) 1H | 12,000 | Drill (horizontal) | LOUT, J, A-123, Sec 96Bottom hole: DAVIDSON, J F, A-62, Sec 10 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-08-19 | SABINE ENERGY INC. | EVANS B (AW) 2H | 12,000 | Drill (horizontal) | PRICE, J, A-167, Sec 305Bottom hole: BENTON, D, A-31, Sec 233 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-09-17 | SABINE ENERGY INC. | EVANS A (AW) 1H | 12,000 | Drill (horizontal) | PRICE, J, A-167, Sec 305Bottom hole: DAVIDSON, J F, A-62, Sec 10 | WILLOW SPRINGS (COTTON VALLEY) |
| 2026-03-18 | MUD CREEK OPERATING, LLC | EVANS, M. W. 2 | 11,017 | Recompletion | PRICE, J, A-167, Sec 305 | WILLOW SPRINGS (TRAVIS PEAK) |
| 2026-11-02 | BUFFCO PRODUCTION INC. | LONGVIEW NORTH - HENDERSON (AW) 1H | 11,000 | Drill (horizontal) | HILL, D, A-93Bottom hole: DIXON, J F, A-57, Sec 234 | WILLOW SPRINGS (COTTON VALLEY) |
| 2026-04-17 | FAULCONER ENERGY, LLC | SPEAR NO. 1 1 | 10,958 | Recompletion | DIXON, J F, A-57, Sec 234 | WILLOW SPRINGS (T.PEAK TRANS.) |
| 2026-08-03 | FAULCONER ENERGY, LLC | HAMBY 4 1 | 10,950 | Recompletion | PRICE, W, A-168, Sec 9 | WILLOW SPRINGS (TRAVIS PEAK) |
| 2025-08-27 | BUFFCO PRODUCTION INC. | MACKEY, L.L. 2 | 10,921 | Recompletion | RAINS, P P, A-258 | WILLOW SPRINGS (RODESSA) |
| 2026-10-28 | NECHES EXPLORATION, L.L.C. | CULPEPPER 7 | 10,799 | Recompletion | SANCHEZ, D, A-186 | WILLOW SPRINGS (PETTIT); WILLOW SPRINGS (TRAVIS PEAK) |
| 2025-09-10 | CRATON OPERATING LLC | THRASHER, S.R. 2 | 10,775 | Recompletion | ROBINSON, W, A-177 | WILLOW SPRINGS (T.PEAK TRANS.) |
| 2025-07-24 | BUFFCO PRODUCTION INC. | HENDERSON, C.D. GAS UNIT 2 | 9,560 | Recompletion | HILL, D, A-93 | WILLOW SPRINGS (PETTIT) |
| 2025-10-13 | HARLETON OIL & GAS INC. | A.J. MONEY 1 | 9,500 | Recompletion | VAN SICKLE, B A, A-234 | GLADEWATER, E. (PETTIT) |
All Gregg County permits since June 2025
| Issued | Operator | Lease and well | Total depth (ft) | Type | Survey, abstract, block, section | Fields listed on the permit |
|---|---|---|---|---|---|---|
| 2026-11-02 | BUFFCO PRODUCTION INC. | LONGVIEW NORTH - HENDERSON (AW) 1H | 11,000 | Drill (horizontal) | HILL, D, A-93Bottom hole: DIXON, J F, A-57, Sec 234 | WILLOW SPRINGS (COTTON VALLEY) |
| 2026-10-28 | NECHES EXPLORATION, L.L.C. | CULPEPPER 7 | 10,799 | Recompletion | SANCHEZ, D, A-186 | WILLOW SPRINGS (PETTIT); WILLOW SPRINGS (TRAVIS PEAK) |
| 2026-08-03 | FAULCONER ENERGY, LLC | HAMBY 4 1 | 10,950 | Recompletion | PRICE, W, A-168, Sec 9 | WILLOW SPRINGS (TRAVIS PEAK) |
| 2026-04-17 | FAULCONER ENERGY, LLC | SPEAR NO. 1 1 | 10,958 | Recompletion | DIXON, J F, A-57, Sec 234 | WILLOW SPRINGS (T.PEAK TRANS.) |
| 2026-04-16 | ROSE CITY RESOURCES, LLC | VAIL 1H | 8,500 | Drill (horizontal) | AVERY, W W, A-231 | CREWS HILL (PETTIT) |
| 2026-03-18 | MUD CREEK OPERATING, LLC | EVANS, M. W. 2 | 11,017 | Recompletion | PRICE, J, A-167, Sec 305 | WILLOW SPRINGS (TRAVIS PEAK) |
| 2026-03-04 | ROSE CITY RESOURCES, LLC | BEAVER CREEK 1H | 8,300 | Drill (horizontal) | AVERY, W W, A-231Bottom hole: PERKINS, L, A-173 | CREWS HILL (PETTIT) |
| 2025-10-13 | HARLETON OIL & GAS INC. | A.J. MONEY 1 | 9,500 | Recompletion | VAN SICKLE, B A, A-234 | GLADEWATER, E. (PETTIT) |
| 2025-09-17 | SABINE ENERGY INC. | EVANS A (AW) 1H | 12,000 | Drill (horizontal) | PRICE, J, A-167, Sec 305Bottom hole: DAVIDSON, J F, A-62, Sec 10 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-09-10 | CRATON OPERATING LLC | THRASHER, S.R. 2 | 10,775 | Recompletion | ROBINSON, W, A-177 | WILLOW SPRINGS (T.PEAK TRANS.) |
| 2025-08-27 | BUFFCO PRODUCTION INC. | MACKEY, L.L. 2 | 10,921 | Recompletion | RAINS, P P, A-258 | WILLOW SPRINGS (RODESSA) |
| 2025-08-19 | SABINE ENERGY INC. | EVANS B (AW) 2H | 12,000 | Drill (horizontal) | PRICE, J, A-167, Sec 305Bottom hole: BENTON, D, A-31, Sec 233 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-08-11 | SABINE ENERGY INC. | HAMBY HEIRS A (AW) 1H | 12,000 | Drill (horizontal) | LOUT, J, A-123, Sec 96Bottom hole: DAVIDSON, J F, A-62, Sec 10 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-08-08 | SABINE ENERGY INC. | HAMBY HEIRS C (AW) 3H | 12,000 | Drill (horizontal) | LOUT, J, A-123, Sec 96 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-07-29 | H & T EXPLORATION, INC. | WICKHAM PACKING CO A 2 | 7,350 | Recompletion | PIPKIN, P, A-174, Sec 429 | WILLOW SPRINGS (PETTIT); WILLOW SPRINGS (RODESSA) |
| 2025-07-24 | BUFFCO PRODUCTION INC. | HENDERSON, C.D. GAS UNIT 2 | 9,560 | Recompletion | HILL, D, A-93 | WILLOW SPRINGS (PETTIT) |
| 2025-07-18 | SABINE ENERGY INC. | HAMBY HEIRS B (AW) 2H | 12,000 | Drill (horizontal) | LOUT, J, A-123, Sec 96Bottom hole: BENTON, D, A-31, Sec 233 | WILLOW SPRINGS (COTTON VALLEY) |
| 2025-07-16 | SABINE ENERGY INC. | HAMBY HEIRS D (AW) 4H | 12,000 | Drill (horizontal) | LOUT, J, A-123, Sec 96Bottom hole: CRANE, R T, A-46, Sec 232 | WILLOW SPRINGS (COTTON VALLEY) |
See the permit itself
You can open any of these permits on the RRC’s drilling permit query (search by operator and lease name), or look at where wells sit on a map in the RRC’s public GIS viewer. Our Gregg County page has the county’s production, top leases and operators and a well map.
Source: Texas Railroad Commission drilling permit data (end-of-month files and the daily file); data date: RRC Drilling Permit daily file, downloaded Nov 27, 2026. Each permit is listed once, with its latest filing. Total depth, type, location and fields are as the operator filed them with the RRC; field names come from the RRC field table in its Production Data Query dump. Verify on the RRC before you rely on any of it.