Extrxct
Data as of Aug 2026 production (Jul 2026–Aug 2026 provisional) · permits through Nov 25, 2026 · Source: Texas Railroad Commission · Methodology
Home / Counties / Starr County / Drilling permits

Starr County drilling permits

The Texas Railroad Commission issued 8 drilling permits in Starr County from June 2025 through Nov 25, 2026. 4 are for new holes (3 vertical, 1 directional and 0 horizontal) and 4 are for work on existing wells, such as recompletions and re-entries. The deepest is ILEX ENERGY CORPORATION BROCK 5, permitted to 10,500 feet.

If you own minerals here and want to know what is happening near your land, you’re in the right place. The permits below list the survey, abstract, block and section where each well is to be drilled, which is how mineral owners usually describe a tract, so you can filter the table for yours. Not sure of your abstract number? Our guide on how to find drilling activity near your tract walks through it.

8permits, June 2025–Nov 2026
4for new holes
0horizontal
1permitted to 10,000 ft or deeper

Deepest permits in Starr County

Total depth is the depth the operator applied for, so it shows how deep the operator plans to drill, not where the well will produce. The fields listed on a permit are the RRC fields the operator named for the well. A field name often includes a formation, as in Wescott (Strawn), but the list can include several fields and it doesn’t by itself confirm which zone the operator is targeting.

IssuedOperatorLease and wellTotal depth (ft)TypeSurvey, abstract, block, sectionFields listed on the permit
2026-03-10ILEX ENERGY CORPORATIONBROCK 510,500Drill (directional)DE LA GARZA, J S, A-105, Sec 88Bottom hole: DE VILLAREAL, J F, A-182GARCIAS RIDGE (QUEEN CITY)
2026-03-27TRIAD O&G, LLCMONTALVO, N. R. 628,500RecompletionSAIS, J J, A-347SUN (H-5)
2025-10-20KILLAM OIL CO., LTD.I.V. MONTALVO 'C' 585,822RecompletionSAIS, J J, A-347SUN, NORTH (5810)
2025-10-20KILLAM OIL CO., LTD.I.V. MONTALVO 'C' 495,435RecompletionSAIS, J J, A-347SUN, NORTH (F-4 5300)
2026-04-23PETROVYBE OPCO LLCRICHMOND 175,000Drill (vertical)VILLAREAL, A, A-279, Sec 39WILDCAT; FLORES; FRIO (3400); FRIO (3580)
2026-02-20KILLAM OIL CO., LTD.I.V. MONTALVO 'A' 204,990RecompletionSAIS, J J, A-347SUN, NORTH (F-3-G)
2025-09-02MUELLER EXPLORATION, INC.ALBERTO ALANIZ 14,500Drill (vertical)DE LA GARZA, F, A-92, Sec 78ARROYO GRANDE (QUEEN CITY); EL PUERTO ( CROCKETT C); HHC (CROCKETT "A"); REYNA (HOCKLEY SAND); SANCHEZ (QUEEN CITY)
2026-01-05MUELLER EXPLORATION, INC.ALBERTO ALANIZ 1R4,500Drill (vertical)DE LA GARZA, F, A-92, Sec 78WILDCAT; ARROYO GRANDE (QUEEN CITY); SANCHEZ (QUEEN CITY)

All Starr County permits since June 2025

IssuedOperatorLease and wellTotal depth (ft)TypeSurvey, abstract, block, sectionFields listed on the permit
2026-04-23PETROVYBE OPCO LLCRICHMOND 175,000Drill (vertical)VILLAREAL, A, A-279, Sec 39WILDCAT; FLORES; FRIO (3400); FRIO (3580)
2026-03-27TRIAD O&G, LLCMONTALVO, N. R. 628,500RecompletionSAIS, J J, A-347SUN (H-5)
2026-03-10ILEX ENERGY CORPORATIONBROCK 510,500Drill (directional)DE LA GARZA, J S, A-105, Sec 88Bottom hole: DE VILLAREAL, J F, A-182GARCIAS RIDGE (QUEEN CITY)
2026-02-20KILLAM OIL CO., LTD.I.V. MONTALVO 'A' 204,990RecompletionSAIS, J J, A-347SUN, NORTH (F-3-G)
2026-01-05MUELLER EXPLORATION, INC.ALBERTO ALANIZ 1R4,500Drill (vertical)DE LA GARZA, F, A-92, Sec 78WILDCAT; ARROYO GRANDE (QUEEN CITY); SANCHEZ (QUEEN CITY)
2025-10-20KILLAM OIL CO., LTD.I.V. MONTALVO 'C' 495,435RecompletionSAIS, J J, A-347SUN, NORTH (F-4 5300)
2025-10-20KILLAM OIL CO., LTD.I.V. MONTALVO 'C' 585,822RecompletionSAIS, J J, A-347SUN, NORTH (5810)
2025-09-02MUELLER EXPLORATION, INC.ALBERTO ALANIZ 14,500Drill (vertical)DE LA GARZA, F, A-92, Sec 78ARROYO GRANDE (QUEEN CITY); EL PUERTO ( CROCKETT C); HHC (CROCKETT "A"); REYNA (HOCKLEY SAND) +1 more

See the permit itself

You can open any of these permits on the RRC’s drilling permit query (search by operator and lease name), or look at where wells sit on a map in the RRC’s public GIS viewer. Our Starr County page has the county’s production, top leases and operators and a well map.

Source: Texas Railroad Commission drilling permit data (end-of-month files and the daily file); data date: RRC Drilling Permit daily file, downloaded Nov 27, 2026. Each permit is listed once, with its latest filing. Total depth, type, location and fields are as the operator filed them with the RRC; field names come from the RRC field table in its Production Data Query dump. Verify on the RRC before you rely on any of it.