Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / MISSISSIPPI GAS UNIT

MISSISSIPPI GAS UNIT

RRC gas well 296695, district 06 · CARTHAGE (HAYNESVILLE SHALE) field · San Augustine County · operated by ADAMAS ENERGY LLC

MISSISSIPPI GAS UNIT at a glance

Gas output in Mar 2026–May 2026 was down 71% from the same three months a year earlier. Over the last 12 months it reported 0 BBL of oil and 3,133,030 MCF of gas. In May 2026, the latest month not marked provisional, it reported 0 BBL and 144,714 MCF.

0BBL oil, last 12 monthsno prior data
3.1MMCF gas, last 12 months▼ 58% vs prior 12
$426.91est. gross royalty for May 2026 at decimal
4new permits in San Augustine County this month

Royalty = (0 BBL × $97.31 WTI, Sep 2026, EIA + 144,714 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

01Aug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

0200K400K600K800KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

MISSISSIPPI GAS UNIT production history in brief

By oil-equivalent volume over the last 12 months, MISSISSIPPI GAS UNIT ranks #27 of 581 reporting leases in San Augustine County. It reported production in 28 of the 34 non-provisional months shown, starting in our window in Feb 2024. Its peak gas month in that window was Sep 2024 at 711,583 MCF. The lease is in the CARTHAGE (HAYNESVILLE SHALE) field and is operated by ADAMAS ENERGY LLC; production is reported for the lease as a whole, not per well.

Watch MISSISSIPPI GAS UNIT. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in San Augustine County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-06ROCKCLIFF ENERGY OPERATING IIIOLYMPIA FIELDS OS C4H16,000
2026-10-06ROCKCLIFF ENERGY OPERATING IIIOLYMPIA FIELDS OS D5HB16,000
2026-10-06XTO ENERGY INC.HIGGINBOTHAM-BISON1B14,849
2026-10-05ROCKCLIFF ENERGY OPERATING IIIOLYMPIA FIELDS OS B3HB16,000

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)0105,268
Jun 2026 (provisional)0119,452
May 20260144,714
Apr 20260164,100
Mar 20260193,883
Feb 20260199,395
Jan 20260257,748
Dec 20250299,297
Nov 20250336,839
Oct 20250400,676
Sep 20250432,897
Aug 20250478,761
Jul 20250535,070
Jun 20250524,651
May 20250535,861
Apr 20250559,192
Mar 20250618,983
Feb 20250588,045
Jan 20250666,336
Dec 20240648,252
Nov 20240645,671
Oct 20240684,082
Sep 20240711,583
Aug 20240703,285
Jul 20240542,741
Jun 20240674,778
May 20240658,997
Apr 20240682,167
Mar 20240559,902
Feb 20240356,514
Jan 202400
Dec 202300
Nov 202300
Oct 202300
Sep 202300
Aug 202300

Check these figures in the RRC Production Data Query (Specific Lease Query: district 06, lease 296695). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.