Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / HAMMERHEAD 54-1-28 UNIT

HAMMERHEAD 54-1-28 UNIT

RRC gas well 300117, district 10 · PHANTOM (WOLFCAMP) field · Loving County · operated by ANADARKO E&P ONSHORE LLC

HAMMERHEAD 54-1-28 UNIT at a glance

Oil output in Mar 2026–May 2026 was down 57% from the same three months a year earlier. Over the last 12 months it reported 118,934 BBL of oil and 382,241 MCF of gas. In May 2026, the latest month not marked provisional, it reported 10,397 BBL and 30,324 MCF.

118.9KBBL oil, last 12 months▲ 19% vs prior 12
382.2KMCF gas, last 12 months▲ 12% vs prior 12
$1,101.19est. gross royalty for May 2026 at decimal
8new permits in Loving County this month

Royalty = (10,397 BBL × $97.31 WTI, Sep 2026, EIA + 30,324 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

010K20K30KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

025K50K75K100KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

HAMMERHEAD 54-1-28 UNIT production history in brief

By oil-equivalent volume over the last 12 months, HAMMERHEAD 54-1-28 UNIT ranks #457 of 3,738 reporting leases in Loving County. It reported production in 15 of the 34 non-provisional months shown, starting in our window in Mar 2025. Its peak oil month in that window was Apr 2025 at 26,077 BBL. The lease is in the PHANTOM (WOLFCAMP) field and is operated by ANADARKO E&P ONSHORE LLC; production is reported for the lease as a whole, not per well.

Watch HAMMERHEAD 54-1-28 UNIT. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Loving County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-14VELOCITY WATER SOLUTIONS, LPCOWBELL SWD27,600
2026-10-13TRP OPERATING LLCJONES1D9,000
2026-10-09CIRCLE-S ENERGY, LLCLINDLEY 9221H10,800
2026-10-09CIRCLE-S ENERGY, LLCLINDLEY 9232H10,800
2026-10-08WPX ENERGY PERMIAN, LLCLIZZY STATE 23-26-28N312H14,000
2026-10-06WPX ENERGY PERMIAN, LLCLIZZY STATE 23-26-28G451H14,000
2026-10-06WPX ENERGY PERMIAN, LLCLIZZY STATE 23-26-28H452H14,000
2026-10-01PERMIAN RESOURCES OPERATING, LLCEL CAMPEON UNIT 3154H13,000

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)6,24224,985
Jun 2026 (provisional)7,70024,300
May 202610,39730,324
Apr 20269,87527,282
Mar 202611,49830,499
Feb 20269,93027,497
Jan 202611,36931,484
Dec 202511,13831,491
Nov 202511,40830,701
Oct 202510,87636,293
Sep 20259,11940,434
Aug 20259,38246,951
Jul 202513,44452,025
Jun 202513,20458,353
May 202522,02574,676
Apr 202526,07788,169
Mar 202525,16567,712

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 300117). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.