Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / ASH 55-1-32 UNIT

ASH 55-1-32 UNIT

RRC gas well 300775, district 10 · PHANTOM (WOLFCAMP) field · Loving County · operated by ANADARKO E&P ONSHORE LLC

ASH 55-1-32 UNIT at a glance

It has no production a year earlier to compare with. Over the last 12 months it reported 345,977 BBL of oil and 1,012,690 MCF of gas. In May 2026, the latest month not marked provisional, it reported 23,675 BBL and 66,549 MCF.

346KBBL oil, last 12 months▲ 2237% vs prior 12
1MMCF gas, last 12 months▲ 913% vs prior 12
$2,500.13est. gross royalty for May 2026 at decimal
8new permits in Loving County this month

Royalty = (23,675 BBL × $97.31 WTI, Sep 2026, EIA + 66,549 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

020K40K60KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

0100K200KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

ASH 55-1-32 UNIT production history in brief

By oil-equivalent volume over the last 12 months, ASH 55-1-32 UNIT ranks #46 of 3,738 reporting leases in Loving County. It reported production in 11 of the 34 non-provisional months shown, starting in our window in Jul 2025. Its peak oil month in that window was Jan 2026 at 44,545 BBL. The lease is in the PHANTOM (WOLFCAMP) field and is operated by ANADARKO E&P ONSHORE LLC; production is reported for the lease as a whole, not per well.

Watch ASH 55-1-32 UNIT. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Loving County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-14VELOCITY WATER SOLUTIONS, LPCOWBELL SWD27,600
2026-10-13TRP OPERATING LLCJONES1D9,000
2026-10-09CIRCLE-S ENERGY, LLCLINDLEY 9221H10,800
2026-10-09CIRCLE-S ENERGY, LLCLINDLEY 9232H10,800
2026-10-08WPX ENERGY PERMIAN, LLCLIZZY STATE 23-26-28N312H14,000
2026-10-06WPX ENERGY PERMIAN, LLCLIZZY STATE 23-26-28G451H14,000
2026-10-06WPX ENERGY PERMIAN, LLCLIZZY STATE 23-26-28H452H14,000
2026-10-01PERMIAN RESOURCES OPERATING, LLCEL CAMPEON UNIT 3154H13,000

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)19,97958,270
Jun 2026 (provisional)24,00957,145
May 202623,67566,549
Apr 202620,82869,064
Mar 202624,68776,925
Feb 202633,06757,350
Jan 202644,54562,993
Dec 202538,53579,054
Nov 202533,30284,739
Oct 202531,048100,641
Sep 202523,157120,880
Aug 202529,145179,080
Jul 202514,80499,988

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 300775). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.