Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / EL DIABLO 79-78

EL DIABLO 79-78

RRC oil lease 57792, district 10 · SPRABERRY (TREND AREA) field · Martin County · operated by HIGH NOON RESOURCES, LLC

EL DIABLO 79-78 at a glance

Oil output in Mar 2026–May 2026 was down 25% from the same three months a year earlier. Over the last 12 months it reported 115,175 BBL of oil and 312,122 MCF of gas. In May 2026, the latest month not marked provisional, it reported 9,766 BBL and 29,147 MCF.

115.2KBBL oil, last 12 months▼ 22% vs prior 12
312.1KMCF gas, last 12 months▼ 15% vs prior 12
$1,036.31est. gross royalty for May 2026 at decimal
51new permits in Martin County this month

Royalty = (9,766 BBL × $97.31 WTI, Sep 2026, EIA + 29,147 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

010K20K30K40KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

010K20K30K40KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

EL DIABLO 79-78 production history in brief

By oil-equivalent volume over the last 12 months, EL DIABLO 79-78 ranks #616 of 5,078 reporting leases in Martin County. It reported production in 34 of the 34 non-provisional months shown, starting in our window in Aug 2023. Its peak oil month in that window was Sep 2023 at 30,326 BBL. The lease is in the SPRABERRY (TREND AREA) field and is operated by HIGH NOON RESOURCES, LLC; production is reported for the lease as a whole, not per well.

Watch EL DIABLO 79-78. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Martin County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 A1JM9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 A1LS9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 B1WB9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 C1DN9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 D1MS9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 E2LS9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 F2JM9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 F2WB9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 G2DN9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 I3JM11,000

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)8,58631,095
Jun 2026 (provisional)8,84829,060
May 20269,76629,147
Apr 20267,71127,188
Mar 202610,78330,770
Feb 202610,12226,768
Jan 202610,63824,225
Dec 20259,59024,724
Nov 20259,37021,921
Oct 202510,47823,450
Sep 202510,86921,561
Aug 20258,41422,213
Jul 20257,39530,781
Jun 20256,83920,531
May 20257,97226,879
Apr 202515,50538,246
Mar 202514,17431,693
Feb 202511,89125,222
Jan 20257,89423,521
Dec 202413,70435,135
Nov 202415,73438,064
Oct 202412,55534,603
Sep 202419,29839,625
Aug 202415,06622,424
Jul 202415,34522,563
Jun 202415,79814,609
May 202415,90813,063
Apr 202415,0968,416
Mar 202416,2889,780
Feb 202421,40811,855
Jan 202423,1073,920
Dec 202323,0274,586
Nov 202319,3172,909
Oct 202318,6515,432
Sep 202330,32610,397
Aug 202322,5666,828

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 57792). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.