Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / HULK SMASH B

HULK SMASH B

RRC oil lease 63732, district 10 · SPRABERRY (TREND AREA) field · Midland County · operated by PETROPLEX ENERGY INC.

HULK SMASH B at a glance

Oil output in Mar 2026–May 2026 was down 80% from the same three months a year earlier. Over the last 12 months it reported 240,786 BBL of oil and 880,907 MCF of gas. In May 2026, the latest month not marked provisional, it reported 13,347 BBL and 81,873 MCF.

240.8KBBL oil, last 12 months▼ 27% vs prior 12
880.9KMCF gas, last 12 months▲ 134% vs prior 12
$1,540.32est. gross royalty for May 2026 at decimal
14new permits in Midland County this month

Royalty = (13,347 BBL × $97.31 WTI, Sep 2026, EIA + 81,873 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

020K40K60K80KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

0100K200KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

HULK SMASH B production history in brief

By oil-equivalent volume over the last 12 months, HULK SMASH B ranks #186 of 4,819 reporting leases in Midland County. It reported production in 16 of the 34 non-provisional months shown, starting in our window in Feb 2025. Its peak oil month in that window was Mar 2025 at 78,896 BBL. The lease is in the SPRABERRY (TREND AREA) field and is operated by PETROPLEX ENERGY INC.; production is reported for the lease as a whole, not per well.

Watch HULK SMASH B. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Midland County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-14OVINTIV USA INC.FASKEN TR 7X112HM11,000
2026-10-14OVINTIV USA INC.FASKEN TR 7X113HF11,000
2026-10-13PIONEER NATURAL RES. USA, INC.WILLIS-DONOVAN 15C303H10,404
2026-10-09PIONEER NATURAL RES. USA, INC.DONALD L HUTT FEE 45B102H10,623
2026-10-09PIONEER NATURAL RES. USA, INC.DONALD L HUTT FEE 45D104H10,623
2026-10-07PIONEER NATURAL RES. USA, INC.WILLIS-DONOVAN 15A301H10,544
2026-10-07PIONEER NATURAL RES. USA, INC.WILLIS-DONOVAN 15B302H10,544
2026-10-07PIONEER NATURAL RES. USA, INC.WILLIS-DONOVAN 15D304H10,404
2026-10-05CONTINENTAL RESOURCES, INC.MULDER 2635A01BL12,111
2026-10-05CONTINENTAL RESOURCES, INC.MULDER 2635B02BL12,111

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)13,54463,641
Jun 2026 (provisional)11,74036,124
May 202613,34781,873
Apr 202613,57083,657
Mar 202615,78292,581
Feb 202614,49862,459
Jan 202616,63188,913
Dec 202518,78487,632
Nov 202525,9440
Oct 202528,91296,389
Sep 202530,06586,670
Aug 202537,969100,968
Jul 202544,41194,969
Jun 202551,13974,820
May 202563,66187,385
Apr 202575,08258,470
Mar 202578,89653,575
Feb 202516,9957,408

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 63732). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.