Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / ELLEN C.

ELLEN C.

RRC gas well 300575, district 04 · OWEN (OLMOS) field · Webb County · operated by CATURUS ENERGY, LLC

ELLEN C. at a glance

It has no production a year earlier to compare with. Over the last 12 months it reported 2,634 BBL of oil and 1,109,095 MCF of gas. In May 2026, the latest month not marked provisional, it reported 0 BBL and 88,745 MCF.

2.6KBBL oil, last 12 monthsno prior data
1.1MMCF gas, last 12 months▲ 2149% vs prior 12
$261.80est. gross royalty for May 2026 at decimal
4new permits in Webb County this month

Royalty = (0 BBL × $97.31 WTI, Sep 2026, EIA + 88,745 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

0200400600Aug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

0100K200KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

ELLEN C. production history in brief

By oil-equivalent volume over the last 12 months, ELLEN C. ranks #351 of 8,641 reporting leases in Webb County. It reported production in 11 of the 34 non-provisional months shown, starting in our window in Jul 2025. Its peak gas month in that window was Oct 2025 at 105,159 MCF. The lease is in the OWEN (OLMOS) field and is operated by CATURUS ENERGY, LLC; production is reported for the lease as a whole, not per well.

Watch ELLEN C.. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Webb County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-09CATURUS ENERGY, LLCNEEDMORE-SCIBIENSKI F441H17,500
2026-10-02CATURUS ENERGY, LLCBFM-AIG T304H17,500
2026-10-02CATURUS ENERGY, LLCBFM-AIG U404H17,500
2026-10-02CATURUS ENERGY, LLCBFM-AIG V305H17,500

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)20679,720
Jun 2026 (provisional)5087,567
May 2026088,745
Apr 202621084,446
Mar 202645082,975
Feb 202611485,126
Jan 202629798,714
Dec 2025298102,570
Nov 202522798,216
Oct 2025269105,159
Sep 202533195,473
Aug 2025182100,384
Jul 2025049,321

Check these figures in the RRC Production Data Query (Specific Lease Query: district 04, lease 300575). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.