Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / UNIVERSITY 40

UNIVERSITY 40

RRC oil lease 17171, district 09 · LIN (WOLFCAMP) field · Irion, Crockett County · operated by SEM OPERATING COMPANY LLC

UNIVERSITY 40 at a glance

Gas output in Mar 2026–May 2026 was down 7% from the same three months a year earlier. Over the last 12 months it reported 131,658 BBL of oil and 7,924,838 MCF of gas. In May 2026, the latest month not marked provisional, it reported 9,705 BBL and 664,911 MCF.

131.7KBBL oil, last 12 months▼ 25% vs prior 12
7.9MMCF gas, last 12 months▼ 8% vs prior 12
$2,905.88est. gross royalty for May 2026 at decimal
6new permits in Irion, Crockett County this month

Royalty = (9,705 BBL × $97.31 WTI, Sep 2026, EIA + 664,911 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

010K20K30K40KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

0200K400K600K800KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

UNIVERSITY 40 production history in brief

By oil-equivalent volume over the last 12 months, UNIVERSITY 40 ranks #3 of 1,135 reporting leases in Irion County. It reported production in 34 of the 34 non-provisional months shown, starting in our window in Aug 2023. Its peak gas month in that window was Oct 2023 at 769,234 MCF. The lease is in the LIN (WOLFCAMP) field and is operated by SEM OPERATING COMPANY LLC; production is reported for the lease as a whole, not per well.

Watch UNIVERSITY 40. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Irion, Crockett County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-07PIONEER NATURAL RES. USA, INC.ROCKER B 86A1H8,715
2026-10-07PIONEER NATURAL RES. USA, INC.ROCKER B 86B2H8,715
2026-10-07PIONEER NATURAL RES. USA, INC.ROCKER B 86C3H8,715
2026-10-07PIONEER NATURAL RES. USA, INC.ROCKER B 86D4H8,715
2026-10-07PIONEER NATURAL RES. USA, INC.ROCKER B 86E5H8,715
2026-10-07PIONEER NATURAL RES. USA, INC.ROCKER B 86F6H8,715

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)12,366587,640
Jun 2026 (provisional)8,818657,016
May 20269,705664,911
Apr 202610,213642,258
Mar 202611,237679,394
Feb 202610,288613,646
Jan 202612,435664,680
Dec 202512,543680,906
Nov 202511,124645,113
Oct 202511,133686,412
Sep 202510,819686,430
Aug 202510,977716,432
Jul 202511,603710,411
Jun 202511,553701,861
May 202512,277716,478
Apr 202512,962700,855
Mar 202514,042727,271
Feb 202514,155659,076
Jan 202517,029724,529
Dec 202416,829737,015
Nov 202416,004714,558
Oct 202416,023754,978
Sep 202415,924744,027
Aug 202416,220744,027
Jul 202416,947740,692
Jun 202417,300722,875
May 202418,614714,229
Apr 202420,172729,406
Mar 202422,529736,671
Feb 202422,526673,018
Jan 202426,646708,312
Dec 202327,717729,090
Nov 202328,642714,959
Oct 202331,318769,234
Sep 202329,083614,289
Aug 202333,032591,080

Check these figures in the RRC Production Data Query (Specific Lease Query: district 09, lease 17171). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.