Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / UNIVERSITY 10-11

UNIVERSITY 10-11

RRC oil lease 22763, district 09 · LIN (WOLFCAMP) field · Reagan County · operated by SEM OPERATING COMPANY LLC

UNIVERSITY 10-11 at a glance

Oil output in Mar 2026–May 2026 was up 34% from the same three months a year earlier. Over the last 12 months it reported 533,193 BBL of oil and 1,127,919 MCF of gas. In May 2026, the latest month not marked provisional, it reported 36,547 BBL and 132,192 MCF.

533.2KBBL oil, last 12 months▲ 39% vs prior 12
1.1MMCF gas, last 12 months▲ 110% vs prior 12
$3,946.35est. gross royalty for May 2026 at decimal
4new permits in Reagan County this month

Royalty = (36,547 BBL × $97.31 WTI, Sep 2026, EIA + 132,192 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

020K40K60K80KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

0100K200KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

UNIVERSITY 10-11 production history in brief

By oil-equivalent volume over the last 12 months, UNIVERSITY 10-11 ranks #17 of 3,010 reporting leases in Reagan County. It reported production in 22 of the 34 non-provisional months shown, starting in our window in Aug 2024. Its peak oil month in that window was Dec 2025 at 70,548 BBL. The lease is in the LIN (WOLFCAMP) field and is operated by SEM OPERATING COMPANY LLC; production is reported for the lease as a whole, not per well.

Watch UNIVERSITY 10-11. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Reagan County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-09PIONEER NATURAL RES. USA, INC.RINGO-SLAUGHTER 7H8H10,436
2026-10-09PIONEER NATURAL RES. USA, INC.RINGO-SLAUGHTER 7I9H10,451
2026-10-07PIONEER NATURAL RES. USA, INC.RINGO-BIRD 7G7H10,469
2026-10-05PIONEER NATURAL RES. USA, INC.RINGO-BIRD 7J10H10,469

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)32,855123,004
Jun 2026 (provisional)32,264120,793
May 202636,547132,192
Apr 202640,961125,426
Mar 202642,611126,023
Feb 202643,866114,663
Jan 202655,711114,948
Dec 202570,54899,659
Nov 202568,77365,946
Oct 202561,74756,039
Sep 202539,06539,271
Aug 20258,2459,955
Jul 202515,28428,967
Jun 202524,66859,067
May 202527,47763,015
Apr 202528,90063,615
Mar 202533,11466,572
Feb 202534,11958,588
Jan 202542,62861,637
Dec 202447,57952,668
Nov 202447,12843,171
Oct 202448,22738,629
Sep 202432,887473
Aug 20241,5621,031

Check these figures in the RRC Production Data Query (Specific Lease Query: district 09, lease 22763). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.