Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / WADDELL TR 3

WADDELL TR 3

RRC oil lease 21511, district 10 · BLOCK 31, NW. (PENN UPPER) field · Crane County · operated by BLACKBEARD OPERATING, LLC

WADDELL TR 3 at a glance

Oil output in Mar 2026–May 2026 was down 31% from the same three months a year earlier. Over the last 12 months it reported 128,666 BBL of oil and 121,746 MCF of gas. In May 2026, the latest month not marked provisional, it reported 9,981 BBL and 9,314 MCF.

128.7KBBL oil, last 12 months▼ 34% vs prior 12
121.7KMCF gas, last 12 months▼ 39% vs prior 12
$998.73est. gross royalty for May 2026 at decimal
12new permits in Crane County this month

Royalty = (9,981 BBL × $97.31 WTI, Sep 2026, EIA + 9,314 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

010K20K30K40KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

010K20K30KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

WADDELL TR 3 production history in brief

By oil-equivalent volume over the last 12 months, WADDELL TR 3 ranks #31 of 1,564 reporting leases in Crane County. It reported production in 34 of the 34 non-provisional months shown, starting in our window in Aug 2023. Its peak oil month in that window was Mar 2024 at 36,573 BBL. The lease is in the BLOCK 31, NW. (PENN UPPER) field and is operated by BLACKBEARD OPERATING, LLC; production is reported for the lease as a whole, not per well.

Watch WADDELL TR 3. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Crane County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-13BLACKBEARD OPERATING, LLCSALINAS 1G7413H11,000
2026-10-13BLACKBEARD OPERATING, LLCSALINAS 1J7021H11,000
2026-10-13BLACKBEARD OPERATING, LLCSALINAS 1LA7813H11,000
2026-10-13BLACKBEARD OPERATING, LLCSALINAS 1M7221H11,000
2026-10-13BLACKBEARD OPERATING, LLCSALINAS 1WA8213H11,000
2026-10-13BLACKBEARD OPERATING, LLCSALINAS 1WC8413H11,000
2026-10-09BLACKBEARD OPERATING, LLCSALINAS7222H11,000
2026-10-07BLACKBEARD OPERATING, LLCSALINAS7022H11,000
2026-10-07BLACKBEARD OPERATING, LLCSALINAS7414H11,000
2026-10-07BLACKBEARD OPERATING, LLCSALINAS7814H11,000

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)9,45510,058
Jun 2026 (provisional)9,6769,397
May 20269,9819,314
Apr 20269,7649,181
Mar 202610,65710,399
Feb 202610,0928,792
Jan 202611,6919,258
Dec 202511,7379,971
Nov 202510,9599,904
Oct 202510,73810,630
Sep 202511,20711,632
Aug 202512,70913,210
Jul 202512,81513,342
Jun 202513,38313,413
May 202514,00713,558
Apr 202514,24613,133
Mar 202515,55413,670
Feb 202514,73211,169
Jan 202514,92011,271
Dec 202417,45414,743
Nov 202418,09919,397
Oct 202419,06525,383
Sep 202420,63825,913
Aug 202419,39326,116
Jul 202419,98326,392
Jun 202424,02626,715
May 202425,80827,802
Apr 202429,11728,526
Mar 202436,57328,295
Feb 202430,77822,279
Jan 202427,46420,913
Dec 202317,21513,143
Nov 202316,91512,651
Oct 202318,94015,652
Sep 202319,76217,076
Aug 202321,34920,978

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 21511). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.