Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / UNIVERSITY BLOCK 14 CONS.

UNIVERSITY BLOCK 14 CONS.

RRC oil lease 29524, district 10 · SHAFTER LAKE (SAN ANDRES) field · Andrews County · operated by RING ENERGY, INC.

UNIVERSITY BLOCK 14 CONS. at a glance

Oil output in Mar 2026–May 2026 was down 19% from the same three months a year earlier. Over the last 12 months it reported 371,936 BBL of oil and 271,275 MCF of gas. In May 2026, the latest month not marked provisional, it reported 31,040 BBL and 26,634 MCF.

371.9KBBL oil, last 12 months▼ 17% vs prior 12
271.3KMCF gas, last 12 months▲ 80% vs prior 12
$3,099.07est. gross royalty for May 2026 at decimal
0new permits in Andrews County this month

Royalty = (31,040 BBL × $97.31 WTI, Sep 2026, EIA + 26,634 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

020K40K60KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

010K20K30KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

UNIVERSITY BLOCK 14 CONS. production history in brief

By oil-equivalent volume over the last 12 months, UNIVERSITY BLOCK 14 CONS. ranks #20 of 3,033 reporting leases in Andrews County. It reported production in 34 of the 34 non-provisional months shown, starting in our window in Aug 2023. Its peak oil month in that window was Mar 2024 at 51,925 BBL. The lease is in the SHAFTER LAKE (SAN ANDRES) field and is operated by RING ENERGY, INC.; production is reported for the lease as a whole, not per well.

Watch UNIVERSITY BLOCK 14 CONS.. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

No new permits in this county in the current RRC daily file.

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)28,12426,230
Jun 2026 (provisional)29,53325,460
May 202631,04026,634
Apr 202629,02827,032
Mar 202631,66028,261
Feb 202628,97524,537
Jan 202630,12225,117
Dec 202534,05727,891
Nov 202532,23515,645
Oct 202531,87715,625
Sep 202531,25917,099
Aug 202534,02611,744
Jul 202537,15910,680
Jun 202538,8224,688
May 202541,08613,833
Apr 202534,79311,802
Mar 202537,69813,944
Feb 202533,59114,586
Jan 202538,4422,773
Dec 202444,66816,146
Nov 202436,95716,972
Oct 202430,92313,383
Sep 202434,42615,811
Aug 202438,21315,984
Jul 202437,67716,123
Jun 202439,22413,583
May 202442,33313,530
Apr 202441,70410,665
Mar 202451,92511,243
Feb 202439,14812,626
Jan 202437,99915,970
Dec 202345,62516,877
Nov 202341,83217,488
Oct 202342,36216,167
Sep 202335,21813,268
Aug 202338,84915,885

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 29524). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.