Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / RIO SAN GABRIEL 28-29 UNIT 2

RIO SAN GABRIEL 28-29 UNIT 2

RRC oil lease 51914, district 10 · SPRABERRY (TREND AREA) field · Midland County · operated by DIAMONDBACK E&P LLC

RIO SAN GABRIEL 28-29 UNIT 2 at a glance

Gas output in Mar 2026–May 2026 was up 120% from the same three months a year earlier. Over the last 12 months it reported 204,654 BBL of oil and 2,380,748 MCF of gas. In May 2026, the latest month not marked provisional, it reported 19,017 BBL and 261,538 MCF.

204.7KBBL oil, last 12 months▼ 16% vs prior 12
2.4MMCF gas, last 12 months▲ 57% vs prior 12
$2,622.08est. gross royalty for May 2026 at decimal
14new permits in Midland County this month

Royalty = (19,017 BBL × $97.31 WTI, Sep 2026, EIA + 261,538 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

010K20K30K40KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

0100K200K300KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

RIO SAN GABRIEL 28-29 UNIT 2 production history in brief

By oil-equivalent volume over the last 12 months, RIO SAN GABRIEL 28-29 UNIT 2 ranks #100 of 4,819 reporting leases in Midland County. It reported production in 34 of the 34 non-provisional months shown, starting in our window in Aug 2023. Its peak gas month in that window was May 2026 at 261,538 MCF. The lease is in the SPRABERRY (TREND AREA) field and is operated by DIAMONDBACK E&P LLC; production is reported for the lease as a whole, not per well.

Watch RIO SAN GABRIEL 28-29 UNIT 2. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Midland County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-14OVINTIV USA INC.FASKEN TR 7X112HM11,000
2026-10-14OVINTIV USA INC.FASKEN TR 7X113HF11,000
2026-10-13PIONEER NATURAL RES. USA, INC.WILLIS-DONOVAN 15C303H10,404
2026-10-09PIONEER NATURAL RES. USA, INC.DONALD L HUTT FEE 45B102H10,623
2026-10-09PIONEER NATURAL RES. USA, INC.DONALD L HUTT FEE 45D104H10,623
2026-10-07PIONEER NATURAL RES. USA, INC.WILLIS-DONOVAN 15A301H10,544
2026-10-07PIONEER NATURAL RES. USA, INC.WILLIS-DONOVAN 15B302H10,544
2026-10-07PIONEER NATURAL RES. USA, INC.WILLIS-DONOVAN 15D304H10,404
2026-10-05CONTINENTAL RESOURCES, INC.MULDER 2635A01BL12,111
2026-10-05CONTINENTAL RESOURCES, INC.MULDER 2635B02BL12,111

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)16,518238,601
Jun 2026 (provisional)14,621240,206
May 202619,017261,538
Apr 202618,436226,336
Mar 202616,709209,715
Feb 202614,658164,924
Jan 202617,372195,068
Dec 202519,230207,130
Nov 202519,486209,258
Oct 202519,900217,812
Sep 202513,26294,939
Aug 202515,445115,221
Jul 202520,869190,448
Jun 202511,34484,572
May 202514,894118,450
Apr 202512,47899,801
Mar 202517,27299,099
Feb 202514,902106,869
Jan 202529,857167,970
Dec 202433,262184,413
Nov 202435,718159,620
Oct 202427,031100,593
Sep 20248,88773,621
Aug 202416,023133,010
Jul 202419,372151,269
Jun 202420,282148,389
May 202420,947142,944
Apr 202421,272133,056
Mar 202421,979131,447
Feb 202422,048121,363
Jan 202423,267131,369
Dec 202324,389132,363
Nov 202325,386129,695
Oct 202327,045124,666
Sep 202323,623124,978
Aug 202324,868128,533

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 51914). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.