Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / SCHARBAUER RANCH 10G

SCHARBAUER RANCH 10G

RRC oil lease 62316, district 10 · SPRABERRY (TREND AREA) field · Martin County · operated by PIONEER NATURAL RES. USA, INC.

SCHARBAUER RANCH 10G at a glance

Oil output in Mar 2026–May 2026 was down 70% from the same three months a year earlier. Over the last 12 months it reported 141,122 BBL of oil and 232,933 MCF of gas. In May 2026, the latest month not marked provisional, it reported 7,846 BBL and 13,360 MCF.

141.1KBBL oil, last 12 months▼ 28% vs prior 12
232.9KMCF gas, last 12 months▲ 21% vs prior 12
$802.91est. gross royalty for May 2026 at decimal
51new permits in Martin County this month

Royalty = (7,846 BBL × $97.31 WTI, Sep 2026, EIA + 13,360 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

010K20K30K40KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

010K20K30K40KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

SCHARBAUER RANCH 10G production history in brief

By oil-equivalent volume over the last 12 months, SCHARBAUER RANCH 10G ranks #569 of 5,078 reporting leases in Martin County. It reported production in 17 of the 34 non-provisional months shown, starting in our window in Jan 2025. Its peak oil month in that window was Mar 2025 at 38,570 BBL. The lease is in the SPRABERRY (TREND AREA) field and is operated by PIONEER NATURAL RES. USA, INC.; production is reported for the lease as a whole, not per well.

Watch SCHARBAUER RANCH 10G. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Martin County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 A1JM9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 A1LS9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 B1WB9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 C1DN9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 D1MS9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 E2LS9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 F2JM9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 F2WB9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 G2DN9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 I3JM11,000

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)13510
Jun 2026 (provisional)00
May 20267,84613,360
Apr 202610,07419,845
Mar 202611,89722,342
Feb 202611,29621,524
Jan 202614,18124,893
Dec 202514,35223,645
Nov 202515,25725,288
Oct 202517,15426,048
Sep 202517,91527,025
Aug 202521,01528,953
Jul 202523,36629,926
Jun 202525,22929,620
May 202528,56830,295
Apr 202532,64031,468
Mar 202538,57032,712
Feb 202531,95224,725
Jan 202517,03513,971
Dec 202400
Nov 202400
Oct 202400
Sep 202400
Aug 202400

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 62316). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.