Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / TARZAN ALLOC 1&2

TARZAN ALLOC 1&2

RRC oil lease 62750, district 10 · SPRABERRY (TREND AREA) field · Martin County · operated by XTO ENERGY INC.

TARZAN ALLOC 1&2 at a glance

Oil output in Mar 2026–May 2026 was down 54% from the same three months a year earlier. Over the last 12 months it reported 134,774 BBL of oil and 229,541 MCF of gas. In May 2026, the latest month not marked provisional, it reported 9,019 BBL and 19,528 MCF.

134.8KBBL oil, last 12 months▼ 18% vs prior 12
229.5KMCF gas, last 12 months▲ 72% vs prior 12
$935.25est. gross royalty for May 2026 at decimal
51new permits in Martin County this month

Royalty = (9,019 BBL × $97.31 WTI, Sep 2026, EIA + 19,528 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

010K20K30KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

010K20K30KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

TARZAN ALLOC 1&2 production history in brief

By oil-equivalent volume over the last 12 months, TARZAN ALLOC 1&2 ranks #592 of 5,078 reporting leases in Martin County. It reported production in 20 of the 34 non-provisional months shown, starting in our window in Oct 2024. Its peak oil month in that window was Aug 2025 at 25,641 BBL. The lease is in the SPRABERRY (TREND AREA) field and is operated by XTO ENERGY INC.; production is reported for the lease as a whole, not per well.

Watch TARZAN ALLOC 1&2. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Martin County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 A1JM9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 A1LS9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 B1WB9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 C1DN9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 D1MS9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 E2LS9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 F2JM9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 F2WB9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 G2DN9,700
2026-10-14DIAMONDBACK E&P LLCTATE 11-10 I3JM11,000

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)3,22611,025
Jun 2026 (provisional)4,50417,113
May 20269,01919,528
Apr 20266,90819,441
Mar 20268,68122,710
Feb 20263,7438,268
Jan 20268,13017,050
Dec 202515,55027,130
Nov 202518,47224,096
Oct 20259,08013,901
Sep 202521,82024,395
Aug 202525,64124,884
Jul 202523,63918,535
Jun 202514,95512,294
May 202519,71415,289
Apr 202512,0519,782
Mar 202522,22117,317
Feb 202521,36518,159
Jan 202525,26520,928
Dec 202418,39513,663
Nov 20244,3104,628
Oct 20242,0602,934

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 62750). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.