Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / CONRAD 70-82 B UNIT

CONRAD 70-82 B UNIT

RRC oil lease 62902, district 10 · SPRABERRY (TREND AREA) field · Howard County · operated by HIGHPEAK ENERGY HOLDINGS, LLC

CONRAD 70-82 B UNIT at a glance

Oil output in Mar 2026–May 2026 was up 1077% from the same three months a year earlier. Over the last 12 months it reported 389,833 BBL of oil and 582,423 MCF of gas. In May 2026, the latest month not marked provisional, it reported 15,897 BBL and 50,177 MCF.

389.8KBBL oil, last 12 months▲ 258% vs prior 12
582.4KMCF gas, last 12 months▲ 1557% vs prior 12
$1,694.96est. gross royalty for May 2026 at decimal
4new permits in Howard County this month

Royalty = (15,897 BBL × $97.31 WTI, Sep 2026, EIA + 50,177 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

025K50K75K100KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

020K40K60K80KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

CONRAD 70-82 B UNIT production history in brief

By oil-equivalent volume over the last 12 months, CONRAD 70-82 B UNIT ranks #16 of 3,066 reporting leases in Howard County. It reported production in 13 of the 34 non-provisional months shown, starting in our window in May 2025. Its peak oil month in that window was Aug 2025 at 84,922 BBL. The lease is in the SPRABERRY (TREND AREA) field and is operated by HIGHPEAK ENERGY HOLDINGS, LLC; production is reported for the lease as a whole, not per well.

Watch CONRAD 70-82 B UNIT. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Howard County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-09SURGE OPERATING, LLCTUBB 3919,900
2026-10-09SURGE OPERATING, LLCTUBB 39310,170
2026-10-01SURGE OPERATING, LLCMIYAGI D 38-351AH9,000
2026-10-01SURGE OPERATING, LLCMIYAGI E 38-352AH9,000

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)00
Jun 2026 (provisional)12,10337,977
May 202615,89750,177
Apr 202617,32849,228
Mar 202620,83456,350
Feb 202621,88741,103
Jan 202628,41752,538
Dec 202534,64968,485
Nov 202539,16767,801
Oct 202549,64874,477
Sep 202564,98150,041
Aug 202584,92234,246
Jul 202557,06817,840
Jun 202547,28815,284
May 20254,5942,031
Apr 202500
Mar 202500
Feb 202500
Jan 202500
Dec 202400

Check these figures in the RRC Production Data Query (Specific Lease Query: district 10, lease 62902). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.