Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / SAN AMBROSIA F (SA45) STATE

SAN AMBROSIA F (SA45) STATE

RRC gas well 300376, district 01 · LORENZO (AUSTIN CHALK) field · Webb County · operated by SM ENERGY COMPANY

SAN AMBROSIA F (SA45) STATE at a glance

Oil output in Mar 2026–May 2026 was down 10% from the same three months a year earlier. Over the last 12 months it reported 178,884 BBL of oil and 848,467 MCF of gas. In May 2026, the latest month not marked provisional, it reported 10,647 BBL and 57,802 MCF.

178.9KBBL oil, last 12 months▲ 73% vs prior 12
848.5KMCF gas, last 12 months▲ 145% vs prior 12
$1,206.58est. gross royalty for May 2026 at decimal
4new permits in Webb County this month

Royalty = (10,647 BBL × $97.31 WTI, Sep 2026, EIA + 57,802 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

010K20K30K40KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

0100K200KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

SAN AMBROSIA F (SA45) STATE production history in brief

By oil-equivalent volume over the last 12 months, SAN AMBROSIA F (SA45) STATE ranks #189 of 8,641 reporting leases in Webb County. It reported production in 14 of the 34 non-provisional months shown, starting in our window in Apr 2025. Its peak oil month in that window was May 2025 at 32,168 BBL. The lease is in the LORENZO (AUSTIN CHALK) field and is operated by SM ENERGY COMPANY; production is reported for the lease as a whole, not per well.

Watch SAN AMBROSIA F (SA45) STATE. Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

New drilling permits issued this month in Webb County. RRC production data has no lease coordinates, so we match by county.

IssuedOperatorLeaseWellDepth (ft)
2026-10-09CATURUS ENERGY, LLCNEEDMORE-SCIBIENSKI F441H17,500
2026-10-02CATURUS ENERGY, LLCBFM-AIG T304H17,500
2026-10-02CATURUS ENERGY, LLCBFM-AIG U404H17,500
2026-10-02CATURUS ENERGY, LLCBFM-AIG V305H17,500

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)9,20946,270
Jun 2026 (provisional)8,33548,049
May 202610,64757,802
Apr 202612,60161,317
Mar 202615,78776,740
Feb 20268,25144,648
Jan 202614,97880,613
Dec 202516,98490,608
Nov 202517,72595,271
Oct 202520,86388,965
Sep 202519,67173,058
Aug 202523,83385,126
Jul 202528,65393,375
Jun 202531,274100,994
May 202532,168115,507
Apr 202511,37037,110

Check these figures in the RRC Production Data Query (Specific Lease Query: district 01, lease 300376). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.