Extrxct
Data as of Jul 2026 production (Jun 2026–Jul 2026 provisional) · permits through Oct 14, 2026 · Source: Texas Railroad Commission · Methodology
Home / Operators / SMITH-LINDSEY B (AW)

SMITH-LINDSEY B (AW)

RRC gas well 296930, district 06 · CARTHAGE (HAYNESVILLE SHALE) field · Harrison County · operated by SABINE ENERGY INC.

SMITH-LINDSEY B (AW) at a glance

Gas output in Mar 2026–May 2026 was down 55% from the same three months a year earlier. Over the last 12 months it reported 6 BBL of oil and 2,551,580 MCF of gas. In May 2026, the latest month not marked provisional, it reported 0 BBL and 52,315 MCF.

6BBL oil, last 12 months▼ 85% vs prior 12
2.6MMCF gas, last 12 months▼ 39% vs prior 12
$154.33est. gross royalty for May 2026 at decimal
0new permits in Harrison County this month

Royalty = (0 BBL × $97.31 WTI, Sep 2026, EIA + 52,315 MCF × $2.95 Henry Hub, Sep 2026, EIA) × your decimal. 0.001 is only a placeholder: enter the decimal from your check stub or division order. Gross, before taxes and deductions. Full estimator →

Oil + condensate (BBL per month, last 36 months)

01020304050Aug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Gas (MCF per month, last 36 months)

0200K400K600KAug 23Feb 24Aug 24Feb 25Aug 25Feb 26

Jun 2026 and Jul 2026 are provisional (lighter bars) and usually rise as late reports arrive.

SMITH-LINDSEY B (AW) production history in brief

By oil-equivalent volume over the last 12 months, SMITH-LINDSEY B (AW) ranks #44 of 3,694 reporting leases in Harrison County. It reported production in 26 of the 34 non-provisional months shown, starting in our window in Apr 2024. Its peak gas month in that window was Jul 2024 at 490,546 MCF. The lease is in the CARTHAGE (HAYNESVILLE SHALE) field and is operated by SABINE ENERGY INC.; production is reported for the lease as a whole, not per well.

Watch SMITH-LINDSEY B (AW). Get one email when RRC publishes new production or a new drilling permit for this lease. Free; unsubscribe any time.

We store your email and this lease only to send these alerts. Privacy.

New permits nearby

No new permits in this county in the current RRC daily file.

Monthly production

MonthOil (BBL)Gas (MCF)
Jul 2026 (provisional)1193,620
Jun 2026 (provisional)0231,781
May 2026052,315
Apr 20260129,612
Mar 20260229,797
Feb 20260220,141
Jan 20264258,084
Dec 20250237,293
Nov 20251232,289
Oct 20250249,639
Sep 20250247,510
Aug 20250269,499
Jul 20250276,717
Jun 20250277,147
May 20250297,526
Apr 20250299,706
Mar 20250319,465
Feb 20250304,841
Jan 20259416,763
Dec 20240427,640
Nov 20240381,280
Oct 20244361,304
Sep 20240381,014
Aug 202426456,957
Jul 202442490,546
Jun 20240483,097
May 20246479,230
Apr 20240273,589
Mar 202400
Feb 202400

Check these figures in the RRC Production Data Query (Specific Lease Query: district 06, lease 296930). Production is reported per lease, so a lease with several wells is not split by well.

Source: Texas Railroad Commission (data sets, Production Data Query). Data date: RRC Production Data Query dump, extract dated Sep 18, 2026; production through Jul 2026. Jun 2026 and Jul 2026 are provisional: operators file late and amend, so these months usually rise in later releases. Oil = crude oil + condensate (BBL); gas = gas-well gas + casinghead gas (MCF), as reported to RRC. Methodology.