Extrxct
Data as of Aug 2026 production (Jul 2026–Aug 2026 provisional) · permits through Nov 25, 2026 · Source: Texas Railroad Commission · Methodology
Home / Guides / What a new drilling permit near your land means in Texas

What a new drilling permit near your land means in Texas

If you just found out that an operator got a drilling permit near your land, it’s natural to wonder what it means for you. The good news is that a permit is public, and it tells you a lot about what the operator plans to do. You should know, though, that it’s an early step: a permit is permission to drill, not a promise that a well will be drilled or that it will pay you royalties.

What a drilling permit is

In Texas, an operator can’t start drilling, deepening, plugging back or re-entering a well until the Railroad Commission has granted a permit (16 Tex. Admin. Code §3.5(c), also called Statewide Rule 5). The application is Form W-1 (RRC W-1 instructions). A permit expires no later than two years after the date it was first approved (§3.5(g)), so some permitted wells are never drilled.

To give you a sense of how common they are, the RRC issued 535 new permits in November 2026 through Nov 25, 2026, according to its daily permit file, and the most were in Midland (54), Martin (48) and Upton (43) counties. You can see every one on our permits page, and each county page lists the permits in that county.

How to look up the permit

You can search the RRC’s Drilling Permit (W-1) Query by operator, lease name, county or permit number, and then open the application as it was filed. The things worth reading first are:

  • The purpose of filing. Not every permit is a new hole. It can be a new drill, a recompletion (that’s producing from a different zone in an existing well), a re-entry or an amendment.
  • The lease or unit name and the total acres. This is the lease or pooled unit (several tracts combined so that one well can produce from all of them) that the well is filed on.
  • The depth. A permit can show both the true vertical depth (how deep the well goes, measured straight down) and, for a horizontal well, a much longer length along the wellbore. Owners on the forum have mixed the two up, and it matters if your lease covers only certain depths.
  • The plat. Every application must include a plat (a scaled map of the location). For the first well on a lease or pooled unit, it has to show the entire lease or unit, including all the tracts being pooled. For a horizontal well, it shows the surface location, the first and last take points (the stretch of the lateral that can produce) and the end of the wellbore (§3.5(h)).

Is your tract in it?

A nearby permit only matters to your royalty if your minerals are inside the lease or pooled unit the well is filed on. It helps to compare the plat with your deed or lease description, which usually names the survey, abstract and section. If you’re leased, your lease says whether and how the operator may pool your tract. If your tract is pooled, the operator usually records a pooling declaration (or unit designation) in the county clerk’s records, and that describes every tract in the unit.

If your tract is in the unit, the next things you’ll usually see are a completion report filed with the RRC, production showing up under a lease number, and then a division order from the operator. If you’re not sure who the operator is or how to reach it, see how to find who operates the well on your land.

Next steps

Not legal advice. RRC rules checked Nov 26, 2026; permit counts update with each RRC daily file.

More guides

Sources are linked in the text. Production data source: Texas Railroad Commission, RRC Production Data Query dump, posted Oct 27, 2026.